PRECEDENCE GRAPH ALGORITHM FOR SHOP SCHEDULING PROBLEM

被引:3
|
作者
ASHOUR, S
PARKER, RG
机构
关键词
D O I
10.2307/3008237
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:165 / &
相关论文
共 50 条
  • [41] A Parallel Genetic Algorithm for the Job Shop Scheduling Problem
    Nguyen Huu Mui
    Vu Dinh Hoa
    Luc Tri Tuyen
    2012 IEEE INTERNATIONAL SYMPOSIUM ON SIGNAL PROCESSING AND INFORMATION TECHNOLOGY (ISSPIT), 2012, : 19 - 24
  • [42] A hybrid genetic algorithm for the job shop scheduling problem
    Gonçalves, JF
    Mendes, JJDM
    Resende, MGC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) : 77 - 95
  • [43] A sequence list algorithm for the job shop scheduling problem
    Zhang, Shuli
    Open Electrical and Electronic Engineering Journal, 2013, 7 (SPEC ISS 1): : 55 - 61
  • [44] Genetic algorithm application on the job shop scheduling problem
    Wu, CG
    Xing, XL
    Lee, HP
    Zhou, CG
    Liang, YC
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 2102 - 2106
  • [45] Cooperative coevolutionary algorithm for job shop scheduling problem
    Zhou, Hong
    Wang, Jian
    Shangguan, Chunxia
    Shi, Ruifeng
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2007, 18 (20): : 2449 - 2455
  • [46] A Memetic Algorithm to Solve the Open Shop Scheduling Problem
    Engin, Batuhan Eren
    Sumbul, Mehmet Onur
    Engin, Orhan
    Baysal, Mehmet Emin
    Sarucan, Ahmet
    2015 6TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO), 2015,
  • [47] A message-optimal distributed graph algorithm: Partial precedence constrained scheduling
    Chaudhuri, P
    Thompson, H
    JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2004, 10 (02) : 106 - 119
  • [48] Algorithm Based on Improved Genetic Algorithm for Job Shop Scheduling Problem
    Chen, Xiaohan
    Zhang, Beike
    Gao, Dong
    2019 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION (ICMA), 2019, : 951 - 956
  • [49] A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    Wu, SD
    Byeon, ES
    Storer, RH
    OPERATIONS RESEARCH, 1999, 47 (01) : 113 - 124
  • [50] A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
    Thangaraja, M.
    Kumar, T. Jayanth
    Nandan, K. R.
    JOURNAL OF PROJECT MANAGEMENT, 2022,