A conceptual approach to strategic performance indicators

被引:10
|
作者
Dolan, Tom [1 ]
Walsh, Claire L. [2 ]
Bouch, Chris [3 ]
Carhart, Neil J. [4 ]
机构
[1] UCL, Int Ctr Infrastruct Futures, Dept Sci Technol Engn & Publ Policy, London, England
[2] Newcastle Univ, Sch Civil Engn & Geosci, Ctr Earth Syst Engn Res, Newcastle Upon Tyne, Tyne & Wear, England
[3] Univ Birmingham, Sch Civil Engn, Birmingham, W Midlands, England
[4] Univ Bristol, Dept Civil Engn, Bristol, Avon, England
基金
英国工程与自然科学研究理事会; 英国经济与社会研究理事会;
关键词
government; infrastructure planning; social impact;
D O I
10.1680/jinam.16.00015
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Effective decision-making for the provision and maintenance of infrastructure systems requires strategic performance indicators aligned with a clear vision of the societal benefits that infrastructure will be expected to enable and systemic awareness of interdependencies between infrastructure sectors. This paper proposes a conceptual outcomeoriented approach to strategic infrastructure performance indicators as a systemic alternative to current approaches which predominantly focus on performance within individual sectors. The conceptual approach proposed aligns performance measures with stated priorities and future aspirations rather than past performance; provides a transparent framework for decision-making; can be applied at a range of scales; and creates an evidence base against which indicator design can be justified and reviewed. Additionally, the conceptual outcome-oriented approach proposed is adaptable for application in other areas of infrastructure decision-making, in particular the development of methodologies to assess what infrastructure will be needed in the future.
引用
收藏
页码:132 / 142
页数:11
相关论文
共 50 条
  • [1] Performance indicators as conceptual technologies
    Bob Barnetson
    Marc Cutright
    [J]. Higher Education, 2000, 40 : 277 - 292
  • [2] Performance indicators as conceptual technologies
    Barnetson, B
    Cutright, M
    [J]. HIGHER EDUCATION, 2000, 40 (03) : 277 - 292
  • [3] A conceptual approach to modelling strategic issues to improve the performance and competitiveness of manufacturing
    Mandal, Purnendu
    Love, Peter E. D.
    Gunasekaran, A.
    [J]. 2002, Inderscience Publishers (04) : 3 - 4
  • [4] Impact of Strategic Alignment on Company Performance: An approach based on performance indicators system design
    Azzouz, Mahdia
    Boukhedouma, Saida
    Alimazghi, Zaia
    [J]. ICACSIS 2020: 2020 12TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE AND INFORMATION SYSTEMS (ICACSIS), 2020, : 233 - 240
  • [5] THE STRATEGIC DATA PROJECT'S STRATEGIC PERFORMANCE INDICATORS
    Page, Lindsay C.
    Fullerton, Jon
    Bacher-Hicks, Andrew
    Owens, Antoniya
    Cohodes, Sarah R.
    West, Martin R.
    Glover, Sarah
    [J]. EDUCATION FINANCE AND POLICY, 2013, 8 (03) : 435 - 456
  • [6] Pre-conceptual-schema-based patterns for deriving key performance indicators from strategic objectives
    Zapata-Jaramillo, C. M.
    Castro-Rojas, L. F.
    [J]. INGENIERIA E INVESTIGACION, 2017, 37 (02): : 120 - 128
  • [7] Selecting indicators for strategic performance management
    Marsden, Greg
    Kelly, Charlotte
    Snell, Carolyn
    [J]. MANAGEMENT AND PUBLIC POLICY 2006, 2006, (1956): : 21 - 29
  • [9] Applying a new concept for strategic performance indicators
    Carhart, Neil J.
    Bouch, Chris
    Walsh, Claire L.
    Dolan, Tom
    [J]. INFRASTRUCTURE ASSET MANAGEMENT, 2016, 3 (04) : 143 - 153
  • [10] Measuring Portfolio Strategic Performance Using Key Performance Indicators
    Sanchez, Hynuk
    Robert, Benoit
    [J]. PROJECT MANAGEMENT JOURNAL, 2010, 41 (05) : 64 - 73