共 50 条
- [31] HISTORICAL SITES AND CONSTRUCTION ENGINEER JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1976, 102 (02): : 295 - 301
- [32] TRUST EVALUATION MODEL WITH REGARD TO THE ROLE OF ENGINEER IN PUBLIC CONSTRUCTION PROJECTS IN TAIWAN JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2011, 19 (01): : 6 - 14
- [35] The engineer at a construction site is more a professional manager than an engineer INNOVATIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, VOLS 1 AND 2, 2008, : 1449 - 1451
- [36] Risk Management in the Application of Subway Construction SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING: THEORY AND PRACTICE, VOL 1, 2012, 114 : 987 - 991
- [37] Review on Construction Method of Subway Station MATERIALS PROCESSING TECHNOLOGY, PTS 1-3, 2012, 418-420 : 2078 - 2081
- [38] Progress in Construction of Antwerp Subway. Revue T, Revue Belge du Transport, 1975, (01): : 3 - 17
- [39] The research of subway construction management methods Energy Education Science and Technology Part A: Energy Science and Research, 2014, 32 (06): : 5725 - 5730
- [40] Subway construction experience in Taipei and Bangkok CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 215 - 226