共 50 条
- [21] DISTRIBUTED CONTROL FACILITIES OF REAL-TIME OPERATING SYSTEM. Denki Tsushin Kenkyujo kenkyu jitsuyoka hokoku, 1987, 36 (09): : 1177 - 1182
- [22] Steam-shovel mining of bituminous coal TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1917, 57 : 514 - 549
- [23] Improvement of the Loading Capacity of Narrow Coal Pillars and Control Roadway Deformation in the Longwall Mining System. A Case Study at Khe Cham Coal Mine (Vietnam) INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2020, 1 (02): : 115 - 122
- [25] UNDERGROUND COAL GASIFICATION TESTS MONITORED BY MINICOMPUTER SYSTEM. Pipeline and Gas Journal, 1978, 205 (03):
- [26] PULVERISED COAL COMBUSTION SUCCESSFULLY USED IN RSP SYSTEM. World cement technology, 1979, 10 (07): : 238 - 247
- [27] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (02): : 447 - 472
- [28] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (01): : 149 - 204
- [29] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (03): : 721 - 764
- [30] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (04): : 1221 - 1243