Coal loading facilities operated with shovel system.

被引:0
|
作者
Guillery, C
机构
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:1719 / 1721
页数:3
相关论文
共 50 条
  • [21] DISTRIBUTED CONTROL FACILITIES OF REAL-TIME OPERATING SYSTEM.
    Mizutani, Kenji
    Taniguchi, Hideo
    Okazaki, Masato
    Denki Tsushin Kenkyujo kenkyu jitsuyoka hokoku, 1987, 36 (09): : 1177 - 1182
  • [22] Steam-shovel mining of bituminous coal
    Stoek, HH
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1917, 57 : 514 - 549
  • [23] Improvement of the Loading Capacity of Narrow Coal Pillars and Control Roadway Deformation in the Longwall Mining System. A Case Study at Khe Cham Coal Mine (Vietnam)
    Le Quang Phuc
    Zubov, V. P.
    Phung Manh Dac
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2020, 1 (02): : 115 - 122
  • [24] STUDY OF A COAL-WATER MIXTURE PREPARATION SYSTEM.
    Ito, Hayami
    Tatsumi, Shuhei
    Takao, Shoichi
    Hujimoto, Harumi
    Ozaki, Hironori
    Nenryo Kyokaishi, 1988, 67 (04): : 250 - 256
  • [25] UNDERGROUND COAL GASIFICATION TESTS MONITORED BY MINICOMPUTER SYSTEM.
    Hale, Dean
    Pipeline and Gas Journal, 1978, 205 (03):
  • [26] PULVERISED COAL COMBUSTION SUCCESSFULLY USED IN RSP SYSTEM.
    Fukuda, Yoshiharu
    Ueda, Yoshihiko
    World cement technology, 1979, 10 (07): : 238 - 247
  • [27] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES
    SHAW, T
    BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (02): : 447 - 472
  • [28] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES
    SHAW, T
    BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (01): : 149 - 204
  • [29] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES
    SHAW, T
    BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (03): : 721 - 764
  • [30] THE EVOLUTION OF INDUCTIVE LOADING FOR BELL SYSTEM TELEPHONE FACILITIES
    SHAW, T
    BELL SYSTEM TECHNICAL JOURNAL, 1951, 30 (04): : 1221 - 1243