共 50 条
- [43] On the time value of absolute ruin with debit interest. INSURANCE MATHEMATICS & ECONOMICS, 2006, 39 (03): : 406 - 406
- [46] FORMAL MODELS FOR REPRESENTATION OF LEXICAL AND TERMINOLOGICAL INFORMATION IN SIASTRO PROJECT DACOROMANIA, 2008, 13 (02): : 151 - 169
- [47] Earned value management in project time control Magazine of Civil Engineering, 2017, 71 (03): : 30 - 38
- [48] Application of Earned Value Method for evaluation the Time/Cost Consequences of Variation Orders in a Construction Project WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2017, 245
- [49] REPRESENTATION AND EVALUATION OF RESIDENCE TIME DISTRIBUTIONS INDUSTRIAL & ENGINEERING CHEMISTRY FUNDAMENTALS, 1963, 2 (04): : 278 - &
- [50] Application of value engineering in project bid evaluation PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 998 - 1000