Assessment and Control of Ore Dilution in Long Hole Mining: Case Studies

被引:18
|
作者
Henning, John [1 ]
Mitri, Hani [2 ]
机构
[1] Goldcorp Canada Inc, Porcupine Gold Mines, 4315 Gold Mine Rd, South Porcupine, ON P0N1H0, Canada
[2] McGill Univ, Dept Min Met & Mat Engn, Montreal, PQ H3A2A7, Canada
关键词
Parametric numerical modeling; Ore dilution; Rock mechanics; Underground mining; Hanging-wall reinforcement; Stope type; Stope case study;
D O I
10.1007/s10706-008-9172-9
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents the results of an examination of factors influencing ore dilution in a blasthole stoping environment. For the study, a comprehensive database was established, incorporating information related to the design, construction, excavation and cavity surveys of 172 sequentially mined long hole stope case histories from two orezones. Through a review of the case studies, it was demonstrated that, in addition to stope dimension, the amount of unplanned dilution differed according to stope type. Five stope types were identified, based on their position within a tabular blasthole mining sequence. Measured overbreak varies with stope type, with secondary stopes generating a greater volume of hanging-wall dilution than do primary stopes. Furthermore, a case study is presented to demonstrate the role cablebolts installed in the stope hanging-wall play to control ore dilution. The study illustrates relationships between measured hanging-wall overbreak, cablebolt orientation and stope type.
引用
收藏
页码:349 / 366
页数:18
相关论文
共 50 条
  • [21] Control of Rock Mechanics in Underground Ore Mining
    Golik, V. I.
    Efremenkov, A. B.
    VIII INTERNATIONAL SCIENTIFIC PRACTICAL CONFERENCE INNOVATIVE TECHNOLOGIES IN ENGINEERING, 2017, 221
  • [22] Open stope cavity monitoring for the control of dilution and ore loss
    Jarosz, AP
    Shepherd, L
    MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 63 - 66
  • [23] Noise impact assessment of an iron ore mining complex
    Gorai, A. K.
    Pal, A. K.
    NOISE CONTROL ENGINEERING JOURNAL, 2006, 54 (06) : 352 - 359
  • [24] A Life Cycle Assessment study of iron ore mining
    Ferreira, Helio
    Praca Leite, Mariangela Garcia
    JOURNAL OF CLEANER PRODUCTION, 2015, 108 : 1081 - 1091
  • [25] Geomechanical assessment of ore drawpoint stability in mining with caving
    S. A. Neverov
    A. A. Neverov
    Journal of Mining Science, 2013, 49 : 265 - 272
  • [26] Data Mining and Control Loop Performance Assessment: The Multivariate Case
    Das, Laya
    Rengaswamy, Raghunathan
    Srinivasan, Babji
    AICHE JOURNAL, 2017, 63 (08) : 3311 - 3328
  • [27] Geomechanical assessment of ore drawpoint stability in mining with caving
    Neverov, S. A.
    Neverov, A. A.
    JOURNAL OF MINING SCIENCE, 2013, 49 (02) : 265 - 272
  • [28] Resue Firing and Dilution Control in Narrow Vein Mining
    Tuck, M.
    NARROW VEIN MINING CONFERENCE 2008, PROCEEDINGS, 2008, (09): : 195 - 197
  • [29] Long-hole destress blasting for rockburst control during deep underground coal mining
    Konicek, Petr
    Soucek, Kamil
    Stas, Lubomir
    Singh, Rajendra
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2013, 61 : 141 - 153
  • [30] Mining case studies
    World Pumps, 1998, (384):