共 38 条
- [32] Study on Power Frequency Follow Current Interruption Test of Self Arc-extinguishing Lightning Protection Gap in 35 kV Distribution Lines Dianwang Jishu/Power System Technology, 2021, 45 (03): : 1208 - 1213
- [35] Failure aspects of electronic watt-hour meters due to direct lightning strikes to distribution lines - Electromagnetic disturbance caused by lightning current flowing through watt-hour meters and its countermeasure- Ishimoto, Kazuyuki (ishimoto@criepi.denken.or.jp), 1600, Institute of Electrical Engineers of Japan (137): : 766 - 776
- [38] Parameter Selection Suggestion of Power Frequency Follow Current Interruption Capability for Multi-chamber Gap Lightning Protection Device Used in 10 kV Distribution Lines Dianwang Jishu/Power System Technology, 2019, 43 (04): : 1480 - 1486