共 50 条
- [42] SMALL BATCH-PRODUCTION WITH A SLIDING-HEADSTOCK AUTOMATIC [J]. MACHINERY AND PRODUCTION ENGINEERING, 1975, 126 (3259): : 484 - 486
- [45] REACTIVE SCHEDULING STRATEGIES IN INTEGRATED BATCH-PRODUCTION CONTROL [J]. HUNGARIAN JOURNAL OF INDUSTRIAL CHEMISTRY, 1995, 23 (03): : 233 - 236
- [47] AUTOMATING THE CALCULATIONS INVOLVED IN THE ORGANIZATION AND FUNCTIONING OF BATCH-PRODUCTION [J]. SOVIET JOURNAL OF OPTICAL TECHNOLOGY, 1981, 48 (05): : 303 - 305
- [50] GT PLUS COMPUTER TIME - EFFECTIVE FORMULA FOR BATCH-PRODUCTION [J]. MACHINERY AND PRODUCTION ENGINEERING, 1976, 129 (3340): : 642 - 647