ALGORITHMS FOR REAL-TIME SCHEDULING OF JOBS ON MIXED-MODEL ASSEMBLY LINES

被引:30
|
作者
BOLAT, A [1 ]
SAVSAR, M [1 ]
ALFAWZAN, MA [1 ]
机构
[1] KING FAHAD UNIV PETR & MINERALS,DEPT SYST ENGN,DHAHRAN,SAUDI ARABIA
关键词
Algorithms - Computational methods - Heuristic programming - Job analysis - Mathematical models - Operations research - Production control - Real time systems;
D O I
10.1016/0305-0548(94)90098-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problem of how to sequence jobs with options on a mixed model assembly line without work-in-process storage has been well addressed in the literature. In almost all of the previously developed models, the common goal has been to generate schedules that would maximize the utilization of station capacities. However, the problem of setups and utility work, which is the uncompleted work on a job leaving the station, has not been studied in detail. In this paper, a generalized formulation of the sequencing problem is presented. A Branch and Bound procedure and two heuristic algorithms are developed to determine a sequence which minimizes total setup and utility work costs simultaneously. The Branch and Bound algorithm is restricted to small size problems, while the heuristics can be used to obtain a solution for any realistic problem within a very small amount of computation time. The algorithms are tested on real data and shown to be applicable to real-time scheduling of jobs on mixed model assembly lines.
引用
下载
收藏
页码:487 / 498
页数:12
相关论文
共 50 条
  • [41] Ant Colony Optimization algorithms for scheduling the mixed model assembly lines
    Sun, XY
    Sun, LY
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 911 - 914
  • [42] Virtual Level Rescheduling for Automotive Mixed-model Assembly Lines with Beam Search Algorithms
    Cao, Can
    Sun, Hui
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 225 - 229
  • [43] Complexity Results for Mixed-Model Assembly Lines with Approximation Algorithms for the Single Station Case
    Oliver Goldschmidt
    Jonathan F. Bard
    Alexan Takvorian
    International Journal of Flexible Manufacturing Systems, 1997, 9 : 251 - 272
  • [44] EXPERT SYSTEM MIXED-MODEL ASSEMBLY LINE SCHEDULING
    VARGAS, JE
    PISHORI, R
    NATU, R
    KEE, CJ
    EXPERT SYSTEMS WITH APPLICATIONS, 1992, 5 (1-2) : 79 - 85
  • [45] REAL-TIME SCHEDULING ALGORITHMS
    FERRARI, AD
    DR DOBBS JOURNAL, 1994, 19 (15): : 60 - &
  • [46] Balancing and sequencing of parallel mixed-model assembly lines
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (17) : 5089 - 5113
  • [47] OPTIMAL MIXED-MODEL SEQUENCING FOR BALANCED ASSEMBLY LINES
    DAREL, EM
    CUCUY, S
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1977, 5 (03): : 333 - 342
  • [48] Minimizing work overload in mixed-model assembly lines
    Bautista, Joaquin
    Cano, Jaime
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 177 - 191
  • [49] Including rest allowance in mixed-model assembly lines
    Finco, Serena
    Calzavara, Martina
    Sgarbossa, Fabio
    Zennaro, Ilenia
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (24) : 7468 - 7490
  • [50] A STUDY ON DESIGN METHOD FOR MIXED-MODEL ASSEMBLY LINES
    Xu, Zhuqi
    Hiraki, Shusaku
    Ishihara, Yoshiaki
    Su, Yuanming
    ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 77 - +