Reconfigurable Assembly System Design Methodology: A Wing Assembly Case Study

被引:12
|
作者
Jefferson, Thomas G. [1 ]
Benardos, Panorios [1 ]
Ratchev, Svetan [1 ]
机构
[1] Univ Nottingham, Nottingham NG7 2RD, England
基金
英国工程与自然科学研究理事会;
关键词
D O I
10.4271/2015-01-2594
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Current assembly systems that deal with large, complex structures present a number of challenges with regard to improving operational performance. Specifically, aerospace assembly systems comprise a vast array of interrelated elements interacting in a myriad of ways, resulting in a deeply complex process that requires a multi-disciplined team of engineers. The current approach to ramp-up production rate involves building additional main assembly fixtures which require large investment and lead times up to 24 months. Within Airbus Operations Ltd there is a requirement to improve the capacity and flexibility of assembly systems, thereby reducing non-recurring costs and time-to-market. Recent trends to improve manufacturing agility advocate Reconfigurable Assembly Systems (RAS) as a viable solution. Yet, adding reconfigurability to assembly systems further increases both the operational and design complexity. Despite the increase in complexity for reconfigurable assembly, few formal methodologies or frameworks exist specifically to support the design of RAS. In this paper, a novel RAS design methodology is specified to address the design complexity. The methodology is a holistic, hierarchical approach to system design which integrates reconfigurability principles, Axiomatic Design and Design Structure Matrices. A wing assembly case study is used to illustrate how the methodology translates reconfigurability requirements into a system that is scalable and flexible from the outset. The resultant reconfigurable cell design assembles the wing's spars and ribs with ramp-up capability from 40 to 100 aircraft per month. Cell designs are presented as CATIA models. The data used is CAD data from a current single aisle wing. Production data is sourced from current single aisle assembly.
引用
收藏
页码:31 / 48
页数:18
相关论文
共 50 条
  • [21] Linking product design to flexibility in an assembly system: a case study?01
    Asadi, Narges
    Jackson, Mats
    Fundin, Anders
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2017, 28 (05) : 610 - 630
  • [22] Safety Design and Verification in Reconfigurable Assembly Systems
    Mahjoub, Yassine Idel
    Berger, Thierry
    Bonte, Therese
    Sallez, Yves
    12TH INTERNATIONAL WORKSHOP ON SERVICE ORIENTED, HOLONIC AND MULTI-AGENT MANUFACTURING SYSTEMS FOR INDUSTRY OF THE FUTURE, SOHOMA 2022, 2023, 1083 : 423 - 433
  • [23] Design for assembly in the caravan industry - a case study
    Daniel, JA
    Wills, SP
    Darling, J
    Mileham, AR
    Owen, GW
    ADVANCES IN MANUFACTURING TECHNOLOGY - XIV, 2000, : 187 - 192
  • [24] CAD-BASED DESIGN AND ANALYSIS SYSTEM FOR RECONFIGURABLE FIXTURES IN ROBOTIC ASSEMBLY
    SHIRINZADEH, B
    COMPUTING & CONTROL ENGINEERING JOURNAL, 1994, 5 (01): : 41 - 46
  • [25] Design of Human-Machine Collaborative Assembly System Based on Reconfigurable Processes
    Hou, Zhe
    Zhang, Dailin
    Zhao, Xingwei
    INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2024, PT II, 2025, 15202 : 376 - 387
  • [26] Development of agent for reconfigurable assembly system with JADE
    Meng, Fanli
    Tan, Dalong
    Wang, Yuechao
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7915 - +
  • [27] Improving schedule accuracy of a reconfigurable assembly system
    Schamp, M.
    Hoedt, S.
    Vandenhoeke, D.
    Demasure, T.
    Huysentruyt, S.
    Lamote, J.
    Aghezzaf, E. H.
    Cottyn, J.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2025,
  • [28] Design methodology of automation equipment and control system in the intelligent assembly cell
    Danisova, Nina
    Ruzarovsky, Roman
    Velisek, Karol
    INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 2407 - 2412
  • [29] Task-reconfigurable system for MEMS assembly
    Sun, LN
    Xie, H
    Rong, WB
    Chen, LG
    2005 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), VOLS 1-4, 2005, : 832 - 837
  • [30] Variability-oriented assembly system design: a case study in the construction industry
    Azzi, Anna
    Battini, Daria
    Faccio, Maurizio
    Persona, Alessandro
    ASSEMBLY AUTOMATION, 2011, 31 (04) : 348 - 357