An Approach to Locate an In Pit Crusher in Open Pit Mines

被引:20
|
作者
Rahmanpour, M. [1 ]
Osanloo, M. [1 ]
Adibee, N. [1 ]
AkbarpourShirazi, M. [2 ]
机构
[1] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn & Management Sci, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2014年 / 27卷 / 09期
关键词
Open Pit Mining; In Pit Crushing and Conveying; Hub Location Problem;
D O I
10.5829/idosi.ije.2014.27.09c.18
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Haulage costs accounts for 45 to 60% of the total operating costs in large open pit mines. Cost efficiency and high reliability of semi mobile or combined "In Pit Crushing-Conveying (IPCC) and truck" systems compared to conventional truck-shovel systems alone, makes it more appealing to be utilized in modern mining activities. Semi mobile systems have the advantages of both systems, and its operating costs depend on the location of the in pit crushing unit. In this paper, the effective factors on determination of a suitable location of an IPCC are studied and it is investigated as a single hub location problem. The main concerns of the optimum location are minimizing haulage costs and choosing a location regarding the environmental concerns. The method is applied in Sarcheshmeh Copper Mine (SCM), and according to the results, locations C1 to C4 are candidate locations, and applying the hub model, location C2 on level 2450 is suggested to locate the IPCC.
引用
收藏
页码:1475 / 1484
页数:10
相关论文
共 50 条
  • [31] PRINCIPLES FOR OPTIMUM DESIGN OF OPEN PIT MINES
    Shi Zhongmin
    Transactions of Nonferrous Metals Society of China, 1997, (01) : 2 - 5
  • [32] RISK MANAGEMENT OF MACHINES IN OPEN PIT MINES
    Kirin, Snezana
    Pantelic, Milorad
    Miljanovic, Igor
    Talovic, Violeta
    STRUCTURAL INTEGRITY AND LIFE-INTEGRITET I VEK KONSTRUKCIJA, 2013, 13 (03): : 197 - 202
  • [33] Planning of open pit mines on a risk basis
    Steffen, OKH
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1997, 97 (02): : 47 - 56
  • [34] OPTIMUM DESIGN OF OPEN-PIT MINES
    LERCHS, H
    GROSSMAN.FI
    OPERATIONS RESEARCH, 1964, 12 : B59 - &
  • [35] PLANNING AND APPLICATION OF HYDRAULIC SHOVELS IN OPEN PIT MINES: SHOVELS/TRUCK OPERATION, SHOVEL/CRUSHER OPERATION.
    Holke, Bernd
    Journal of Mines, Metals and Fuels, 1985, 34 (04):
  • [36] Determination of the largest pit with the non-negative net profit in the open pit mines
    Gholamnejad, J.
    Mojahedfar, A. R.
    JOURNAL OF MINING AND ENVIRONMENT, 2010, 1 (02): : 45 - 52
  • [37] Simultaneous Optimization of Final Pit and Production Schedule in Open-pit Coal Mines
    Gu Xiaowei
    Wang Pengfei
    Wang Qing
    Zheng Youyi
    Liu Jianping
    Chen Bin
    INNOVATION MANUFACTURING AND ENGINEERING MANAGEMENT, 2011, 323 : 222 - +
  • [38] Controls on pit lake water quality at sixteen open-pit mines in Nevada
    Shevenell, L
    Connors, KA
    Henry, CD
    APPLIED GEOCHEMISTRY, 1999, 14 (05) : 669 - 687
  • [39] A practical algorithm for final-pit optimization in open-pit coal mines
    Xu, Xiao-Chuan
    Gu, Xiao-Wei
    Wang, Qing
    Zheng, You-Yi
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (05): : 715 - 718
  • [40] RELIABILITY ANALYSIS OF DRILLING OPERATION IN OPEN PIT MINES
    Rahimdel, M. J.
    Ataei, M.
    Kakaei, R.
    Hoseinie, S. H.
    ARCHIVES OF MINING SCIENCES, 2013, 58 (02) : 569 - 578