Seismic Loss Estimation with Consideration of Aftershock Hazard and Post-Quake Decisions

被引:20
|
作者
Han, Ruilong [1 ]
Li, Yue [2 ]
van de Lindt, John [3 ]
机构
[1] Gilsanz Murray Steficek Llp, 129 W 27th St, New York, NY 10001 USA
[2] Case Western Reserve Univ, Dept Civil Engn, Cleveland, OH 44106 USA
[3] Colorado State Univ, Dept Civil & Environm Engn, Infrastruct, Ft Collins, CO 80523 USA
基金
美国国家科学基金会;
关键词
D O I
10.1061/AJRUA6.0000875
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Current seismic performance methodologies already have the ability to estimate the direct loss, downtime, and fatalities of buildings because of earthquakes using performance-based earthquake engineering (PBEE). However, earthquake aftershocks that have the potential to cause additional damage to buildings are not considered in these methodologies. Conversely, previous seismic performance assessments considering aftershocks, which were on the basis of simplified models that do not have the capacity to simulate details, cannot account for various post-quake decisions (e.g., evacuation, safety evaluation, and repair). In this study, the effects of aftershocks and postquake decisions on seismic performance are discussed. An assessment procedure in accordance with other PBEE-based methods, but also with the ability to consider aftershocks, is proposed. A framework was developed according to the procedure. An illustrative case study also is presented using two nonductile reinforced concrete frame buildings. A total of 18 near-fault and 60 far-field recorded mainshock-aftershock sequences are employed in the example. The case study showed that mainshock-aftershock sequences can result in significantly more serious consequences than when only the mainshock is considered. Also, using only one aftershock instead of multiple aftershocks was found to be an acceptable balance between computational effort and accuracy. (C) 2016 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 25 条
  • [21] Unification of Seismic Performance Estimation and Real Estate Investment Analysis to Model Post-Earthquake Building Repair Decisions
    Markhvida, Maryia
    Baker, Jack W.
    EARTHQUAKE SPECTRA, 2018, 34 (04) : 1787 - 1808
  • [22] Random forest-based multi-hazard loss estimation using hypothetical data at seismic and tsunami monitoring networks
    Li, Yao
    Goda, Katsuichiro
    GEOMATICS NATURAL HAZARDS & RISK, 2023, 14 (01)
  • [23] A Consistent Cross-Border Seismic Hazard Methodology for Loss Estimation and Risk Management along the Border Regions of Canada and the United States
    Thenhaus, Paul C.
    Campbell, Kenneth W.
    Gupta, Nitin
    Smith, David F.
    Khater, Mahmoud M.
    EARTHQUAKE SPECTRA, 2015, 31 (01) : 1 - 17
  • [24] Improving the Accuracy of Near Real-Time Seismic Loss Estimation Using Post-Earthquake Remote Sensing Images
    Lu, Xinzheng
    Zeng, Xiang
    Xu, Zhen
    Guan, Hong
    EARTHQUAKE SPECTRA, 2018, 34 (03) : 1219 - 1245
  • [25] Probabilistic economic seismic loss estimation in steel buildings using post-tensioned moment-resisting frames and viscous dampers
    Dimopoulos, Athanasios I.
    Tzimas, Angelos S.
    Karavasilis, Theodore L.
    Vamvatsikos, Dimitrios
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2016, 45 (11): : 1725 - 1741