ASSESSMENT OF AIRFRAME PRODUCTION COST RISK

被引:0
|
作者
FINCHUM, JA [1 ]
机构
[1] STANDARD OIL CO,FT WAYNE,IN 46800
来源
关键词
D O I
10.1287/mnsc.21.2.237
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:237 / 237
页数:1
相关论文
共 50 条
  • [41] A Production Transfer Risk Assessment Framework
    Mogos, Maria Flavia
    Sjobakk, Borge
    Alfnes, Erlend
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 514 : 29 - 39
  • [42] Risk Assessment for the Elements of Production Equipment
    Petrovskii E.A.
    Bukhtoyarov V.V.
    Starostina E.O.
    Chemical and Petroleum Engineering, 2017, 52 (9-10) : 642 - 646
  • [43] Risk assessment of production and storage tankers
    Vinnem, JE
    Haugen, S
    Borresen, R
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 1996, 118 (03): : 198 - 203
  • [44] Practical risk assessment in food production
    Hoeij, Klaske Van
    Notermans, Servé
    Food Science and Technology, 2009, 23 (01): : 28 - 30
  • [45] RISK ASSESSMENT OF ENERGY-PRODUCTION
    YAMADA, T
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1978, 20 (11): : 761 - 764
  • [46] Flight operation and airframe design for tradeoff between cost and environmental impact
    Wang, Yu
    Xing, Yu
    Yu, Xiongqing
    Zhang, Shuai
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART G-JOURNAL OF AEROSPACE ENGINEERING, 2018, 232 (05) : 973 - 987
  • [47] DEVELOPMENT OF COST-EFFECTIVE THERMOPLASTIC COMPOSITES FOR ADVANCED AIRFRAME STRUCTURES
    Krooss, T.
    Gurka, M.
    Duck, V
    Breuer, U.
    20TH INTERNATIONAL CONFERENCE ON COMPOSITE MATERIALS, 2015,
  • [48] LOW-COST ADVANCED TITANIUM AIRFRAME STRUCTURES VIA WELDING
    MESSLER, RW
    PAEZ, CA
    METAL PROGRESS, 1980, 117 (04): : 36 - 40
  • [49] Magnesium for automotive applications: Primary production cost assessment
    Das, S
    JOM-JOURNAL OF THE MINERALS METALS & MATERIALS SOCIETY, 2003, 55 (11): : A22 - A26
  • [50] Magnesium for automotive applications: Primary production cost assessment
    Sujit Das
    JOM, 2003, 55 (11) : 22 - 26