WEDGE ANCHORAGE SYSTEM FOR STRAND POST-TENSIONING

被引:0
|
作者
SCHECHTE.E
BOECKER, HC
机构
来源
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:49 / &
相关论文
共 50 条
  • [41] GROUT FOR POST-TENSIONING DUCTS - DISCUSSION
    SCHUPACK, M
    [J]. ACI MATERIALS JOURNAL, 1989, 86 (03) : 328 - 329
  • [42] POST-TENSIONING APPLICATIONS FOR BRIDGE REHABILITATION
    LAMBERSON, EA
    [J]. CONSTRUCTION CONTRACTING, 1983, 65 (02): : 24 - 24
  • [43] Specifications for Unbonded Post-Tensioning Tendons
    [J]. 1600, American Concrete Institute (38):
  • [44] Development Length Assessment of Bonded Post-Tensioning Slabs with Bulb-Shaped Dead end Anchorage
    Aly, Jehan H.
    Maree, A. Farghal
    Kohail, Mohamed
    Khalil, Ayman H.
    [J]. INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2024, 18 (01)
  • [45] CASE HISTORY Wire/Strand Slippage-A Potential Failure Mode for Post-Tensioning Tendons
    Hartt, William H.
    Vincent, John F.
    Ivanov, Vladimir I.
    [J]. MATERIALS PERFORMANCE, 2015, 54 (10) : 34 - 37
  • [46] FRP post-tensioning of laminated timber bridges
    Dagher, HJ
    Schmidt, AL
    Abdel-Magid, B
    Iyer, S
    [J]. EVOLVING TECHNOLOGIES FOR THE COMPETITIVE EDGE, BOOKS 1 AND 2, 1997, 42 : 933 - 938
  • [47] Post-tensioning cuts steel bridge costs
    Spaans, Leo
    [J]. Modern Steel Construction, 1994, 34 (09): : 38 - 43
  • [48] Cable-stayed bridge uses new post-tensioning system
    Caroland, William B.
    Suarez, Jorge M.
    [J]. 2000, AISC, Chicago, IL, USA (40):
  • [49] POST-TENSIONING SYSTEMS - A DESCRIPTION OF THE METHODS AND THE HARDWARE
    不详
    [J]. CONCRETE CONSTRUCTION, 1983, 28 (04): : 323 - &
  • [50] BRIDGE REHABILITATION AND STRENGTHENING BY CONTINUOUS POST-TENSIONING
    VERNIGOR.E
    MARCIL, JRM
    SLATER, WM
    AIKEN, RV
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1969, 14 (02): : 88 - &