A Fuzzy method for qualitative analysis of risks in software development projects

被引:0
|
作者
Lima de Campos, Lidio Mauro [1 ]
Lima, Alberto Sampaio [1 ]
机构
[1] Fed Univ Para, Programa Posgrad Engn Eletr PPGGE, Comp Aplicada, BR-66059 Belem, Para, Brazil
关键词
Software project management; Risk analysis; Fuzzy Logic; Software development;
D O I
10.20397/g&t.v16i2.712
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Organizations need an effective risk management to improve quality in project management. In this work we presented a fuzzy logic based system to execute qualitative analysis of risks, prioritizing risk monitoring, control processes and risk responses. Our main objective was to rank the risks in a software development project and measure the project's exposure to risks, using two metrics based on fuzzy values: index of risks exposure and risk punctuations. We proceeded a case study in a software development project at an IT company, and the results indicate that our proposed fuzzy method increased the possibilities of project's manager decision making, because of values scope assumed by linguistic variables and possible rules combination. The presented metrics improved the sensibility in detection, classification, responses planning and risks control. Our proposed method was considered useful and preferable in relation to current solutions adopted by managers.
引用
收藏
页码:7 / 38
页数:32
相关论文
共 50 条
  • [21] Linguistic fuzzy consensus model for collaborative development of fuzzy cognitive maps: a case study in software development risks
    Carmen De Maio
    Giuseppe Fenza
    Vincenzo Loia
    Francesco Orciuoli
    [J]. Fuzzy Optimization and Decision Making, 2017, 16 : 463 - 479
  • [22] Productivity analysis of Japanese enterprise software development projects
    Tsunoda, Masateru
    Monden, Akito
    Yadohisa, Hiroshi
    Kikuchi, Nahomi
    Matsumoto, Ken-Ichi
    [J]. Proc Int Conf Software Eng, (14-17):
  • [23] ANALYSIS OF DOCUMENT MANAGEMENT SYSTEMS IN SOFTWARE DEVELOPMENT PROJECTS
    Klimov, B. A.
    Romanov, D. Yu.
    [J]. BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2010, 12 (02): : 15 - 23
  • [24] Fuzzy Consensus Qualitative Risk Analysis Framework for Building Construction Projects
    Aboushady, Ahmed M.
    Marzouk, Mohamed M.
    Elbarkouky, Mohamed M. G.
    [J]. PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 1160 - 1165
  • [25] Fuzzy analysis and prediction of commit activity in open source software projects
    Saini, Munish
    Kaur, Kuljit
    [J]. IET SOFTWARE, 2016, 10 (05) : 136 - 146
  • [26] ReBEC: A Method for Capturing Experience during Software Development Projects
    Matturro, Gerardo
    Silva, Andres
    [J]. KNOWLEDGE ENGINEERING AND MANAGEMENT BY THE MASSES, EKAW 2010, 2010, 6317 : 524 - 533
  • [27] FUZZY MODELING OF RISKS IN INVESTMENT AND CONSTRUCTION PROJECTS
    Glushenko, Sergey A.
    Doljenko, Alexey I.
    [J]. BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2015, 32 (02): : 48 - 58
  • [28] Application of fuzzy method to analysis of software reliability
    Liu, Hai-Qing
    Li, Hui
    [J]. Wuhan Daxue Xuebao (Gongxue Ban)/Engineering Journal of Wuhan University, 2002, 35 (06):
  • [29] Resource conflict resolution method for software projects using fuzzy critical chain
    Gao, Yan
    Dong, Chao
    [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2554 - 2559
  • [30] An Unsupervised Model on Outsourcing Software Projects Risks Based on T-S Fuzzy Neural Network
    Ouyang, Z. Z.
    Chen, J. Z.
    Zhang, Z. H.
    Hu, Y.
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL, AUTOMATION AND MECHANICAL ENGINEERING (EAME 2015), 2015, 13 : 411 - 414