A Fuzzy method for qualitative analysis of risks in software development projects

被引:0
|
作者
Lima de Campos, Lidio Mauro [1 ]
Lima, Alberto Sampaio [1 ]
机构
[1] Fed Univ Para, Programa Posgrad Engn Eletr PPGGE, Comp Aplicada, BR-66059 Belem, Para, Brazil
关键词
Software project management; Risk analysis; Fuzzy Logic; Software development;
D O I
10.20397/g&t.v16i2.712
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Organizations need an effective risk management to improve quality in project management. In this work we presented a fuzzy logic based system to execute qualitative analysis of risks, prioritizing risk monitoring, control processes and risk responses. Our main objective was to rank the risks in a software development project and measure the project's exposure to risks, using two metrics based on fuzzy values: index of risks exposure and risk punctuations. We proceeded a case study in a software development project at an IT company, and the results indicate that our proposed fuzzy method increased the possibilities of project's manager decision making, because of values scope assumed by linguistic variables and possible rules combination. The presented metrics improved the sensibility in detection, classification, responses planning and risks control. Our proposed method was considered useful and preferable in relation to current solutions adopted by managers.
引用
收藏
页码:7 / 38
页数:32
相关论文
共 50 条
  • [1] Taxonomy of Risks in Software Development Projects
    Haidabrus, Bohdan
    Druzhinin, Evgeniy
    Psarov, Oleksandr
    [J]. 2022 63RD INTERNATIONAL SCIENTIFIC CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT SCIENCE OF RIGA TECHNICAL UNIVERSITY (ITMS), 2022,
  • [2] Longevity of risks in software development projects: a comparative analysis with an academic environment
    Alves, Luis M.
    Souza, Gustavo
    Ribeiro, Pedro
    Machado, Ricardo J.
    [J]. INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES 2020 (CENTERIS/PROJMAN/HCIST 2020), 2021, 181 : 827 - 834
  • [3] Risks management in software development capstone projects
    Makiaho, Pekka
    Poranen, Timo
    [J]. COMPUTER SYSTEMS AND TECHNOLOGIES (COMPSYSTECH'18), 2018, 1641 : 160 - 164
  • [4] Technology Related Risks on Virtual Software Development Projects
    Reed, April H.
    Knight, Linda V.
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2012, 3 (01) : 1 - 14
  • [5] IDENTIFICATION AND MITIGATION OF RISKS IN DISTRIBUTED DEVELOPMENT OF SOFTWARE PROJECTS
    Veras Coelho, Pedro Henrique
    Fenner, Germano
    Lima, Alberto Sampaio
    [J]. SISTEMAS & GESTAO, 2015, 10 (04): : 599 - 607
  • [6] Mitigating risks in software projects through phased development process - A real options analysis
    Tao, Chen
    Zhang Jinlong
    [J]. GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 556 - 561
  • [7] Software Design Projects Selection by Fuzzy AHP and Fuzzy TOPSIS Method
    Sun, Jin-Wen
    Kang, Yan
    Yang, Xiao-Dong
    [J]. 2015 INTERNATIONAL CONFERENCE ON MECHANICAL SCIENCE AND MECHANICAL DESIGN, MSMD 2015, 2015, : 613 - 619
  • [8] Risks in Students' Software Projects
    Ahtee, Tero
    Poranen, Timo
    [J]. 22ND CONFERENCE ON SOFTWARE ENGINEERING EDUCATION AND TRAINING, PROCEEDINGS, 2009, : 154 - +
  • [9] Qualitative Study of Software for Fuzzy Systems Simulation and Development
    Posselt, Ederson Luis
    Da Rosa E Silva, Luis Felipe
    Frozza, Rejane
    Molz, Rolf Fredi
    [J]. RECENT ADVANCES IN NEURAL NETWORKS, FUZZY SYSTEMS & EVOLUTIONARY COMPUTING, 2010, : 285 - 292
  • [10] A Fuzzy Logic Model for Predicting the Development Schedule of Software Projects
    Lopez-Martin, Cuauhtemoc
    Chavoya, Arturo
    Elena Meda-Campana, Maria
    [J]. 2015 12TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY - NEW GENERATIONS, 2015, : 415 - 420