共 50 条
- [42] THE OPPORTUNITY COST OF REDUCED TIMBER HARVESTS RESULTING FROM COAL-MINE DEVELOPMENT - A CASE-STUDY FORESTRY CHRONICLE, 1989, 65 (05): : 365 - 369
- [46] Optimal target reliability and development of cost-effective aseismic design criteria for a class of RC shear-wall structures STRUCTURAL SAFETY AND RELIABILITY, VOLS. 1-3, 1998, : 1091 - 1098