ASSESSING QUALITY MANAGEMENT RELATIONSHIP IN PUBLIC CONSTRUCTION IN TAIWAN USING FAULT TREE ANALYSIS

被引:0
|
作者
Lee, Shyh-Hwang [1 ]
Chen, Yu-Cheng [1 ]
机构
[1] Shu Te Univ, 59 Hengshan Rd, Kaohsiung 82445, Taiwan
来源
MANAGEMENT RESEARCH AND PRACTICE | 2011年 / 3卷 / 02期
关键词
Public Construction; ISO 9001 Quality Management System; Fault Tree Analysis; Taiwan;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
ISO 9000 has gained popularity and is being applied to manufacture-related companies all over the world as a system of standards related to quality assurance management and control. Fault Tree Analysis (FTA) is an important risk-evaluating technique and has been used to present the relationships among the elements of the ISO 9001 standard in ISO implementation. However, a review of the literature suggests that it is much more difficult to manage quality in relation to construction industry due to its generic nature. This paper used FTA to evaluate the relationships among the elements of the ISO 9001:2008 standard and the root causes of defects on public construction quality assessed by Taiwan Public Construction Commission from year 2005 to 2007. Based on the results in this study, ISO 9000 quality management practices may be needed more emphasized in certain stages, the failed probability of check stage was potentially the highest. The implementation of plan stage was also likely to have a significant effect on public construction quality and this showed the importance of the two major elements of the ISO 9001 standard.
引用
下载
收藏
页码:36 / 45
页数:10
相关论文
共 50 条
  • [1] Assessing failure of bridge construction using fuzzy fault tree analysis
    Pan, Nang-Fei
    Wang, Huaitien
    FOURTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 1, PROCEEDINGS, 2007, : 96 - +
  • [2] Framework for Proactive Change Management: Assessing the Risk of Change in Construction Projects Using Fuzzy Fault Tree Analysis
    Abad, Fatemeh
    Eshtehardian, Ehsan
    Taghizade, Katayoun
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2019, 25 (02)
  • [3] A Study on performance of three levels Quality Management System and the Satisfaction of Implementing Construction Quality of Public Construction in Taiwan
    Lai, Hsin-Hung
    Lin, Chien-Liang
    Lo, Wei
    PROCEEDINGS OF 2016 INTERNATIONAL CONFERENCE ON APPLIED SYSTEM INNOVATION (ICASI), 2016,
  • [4] FAULT TREE NETWORK ANALYSIS FOR CONSTRUCTION
    HADIPRIONO, FC
    CIVIL ENGINEERING SYSTEMS, 1988, 5 (01): : 42 - 48
  • [5] Analysis of Public Building Construction Phase Fire Accidents Based on Fault Tree Analysis Method
    Ying Bo
    Li Huimin
    Huang Ying
    Tan Xiao
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1447 - 1450
  • [6] Quality assurance for electronic systems using fault tree analysis
    Lendvay, M
    Bencsik, AL
    INES 2005: 9TH INTERNATIONAL CONFERENCE ON INTELLIGENT ENGINEERING SYSTEMS, 2005, : 163 - 168
  • [7] Study on Applying Fault Tree Analysis Based on Fuzzy Reasoning in Risk Analysis of Construction Quality
    Shu La
    Li Jianping
    Qiu Min
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 393 - +
  • [8] CONSTRUCTION OF A FAULT TREE USING PROLOG.
    Fukuda, Shuichi
    Transactions of JWRI (Japanese Welding Research Institute), 1984, 13 (01): : 115 - 119
  • [9] Understanding and visualizing schedule deviations in construction projects using fault tree analysis
    Hsu, Pei-Yuan
    Aurisicchio, Marco
    Angeloudis, Panagiotis
    Whyte, Jennifer
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) : 2501 - 2522
  • [10] Research of Risk Control of Public Construction Project Based on Fault Tree
    Chang Liu
    Luo Fuzhou
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1682 - 1685