共 50 条
- [22] Failure investigation of platen superheater tube in a 210 MW thermal power plant boiler TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS, 2010, 63 (2-3): : 687 - 690
- [24] Failure investigation of platen superheater tube in a 210 MW thermal power plant boiler Transactions of the Indian Institute of Metals, 2010, 63 : 687 - 690
- [25] Exergy analysis of a thermal power plant using a modeling approach Clean Technologies and Environmental Policy, 2012, 14 : 805 - 813
- [27] Designing a Concentrated Solar Thermal Power Plant Using Energy–Exergy–Economic–Environment Analysis Applied Solar Energy (English translation of Geliotekhnika), 2020, 56 (06): : 477 - 489
- [29] Exergy Analysis of Thermal Power Plant for Three Different Loads TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2023, 17 (02): : 160 - 166
- [30] Exergy Analysis of 300MW Coal-Fired Power Plant 2012 INTERNATIONAL CONFERENCE ON FUTURE ELECTRICAL POWER AND ENERGY SYSTEM, PT A, 2012, 17 : 926 - 932