CONSIDERATION OF AN IMPERFECT PRODUCTION PROCESS IN THE SUPPLY CHAIN OF AN INTEGRATED INVENTORY MODEL WITH POLYNOMIAL PRESENT VALUE AND DEPENDENT CRASHING COST

被引:0
|
作者
Jou, Yung-Tsan [1 ]
Huang, Po-Tsang Bernie [1 ]
Lo, Chien-Ming [1 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind & Syst Engn, 200 Chung Pei Rd, Jhongli 320, Taiwan
关键词
Integrated inventory; Imperfect production; Time value; Present value;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Many studies have failed to give consideration to time value. However, consideration of the impact of inflation and speedy change of demand, shortening lead time and cost are the most important issues in the supply chain. In a real system, due to the deteriorating production process of the vendor and damage sustained during the transportation process from the vendor to the buyer, an arrival order batch for the buyer may contain some percentage of defective product. Therefore, we consider time value and develop an improved integrated inventory model with imperfect quality items and variable lead time which assumes dependent crashing cost is polynomial. It aims at the minimum present value of integrated inventory joint expected total cost over infinite time horizon. The goal of this paper is to derive simultaneously the optimal order quantity, the length of lead time and the number of lots which are delivered from the vender to the buyer. Finally, a numerical example is given to illustrate results.
引用
收藏
页码:775 / 785
页数:11
相关论文
共 50 条
  • [31] An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain
    Cardenas-Barron, Leopoldo Eduardo
    Teng, Jinn-Tsair
    Treviñio-Garza, Gerardo
    Wee, Hui-Ming
    Lou, Kuo-Ren
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (02) : 384 - 388
  • [32] An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time
    Kumar M.G.
    Uthayakumar R.
    International Journal of System Assurance Engineering and Management, 2017, 8 (Suppl 2) : 1041 - 1054
  • [33] Multistage supply chain inventory model for controllable deterioration and imperfect production with carbon emissions regulations under Stackelberg game approach
    Mahato, Falguni
    Choudhury, Mukunda
    Mahata, Gour Chandra
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024,
  • [34] Optimizing setup cost in (R, T) inventory system model with imperfect production process, quality improvement, and partial backordering
    Taleizadeh A.A.
    Zamani-Dehkordi N.
    Journal of Remanufacturing, 2017, 7 (2-3) : 199 - 215
  • [35] An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period
    Jonrinaldi
    Zhang, D. Z.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (03): : 598 - 620
  • [36] An Integrated Model of Production, Maintenance, and Quality Control with Statistical Process Control Chart of a Supply Chain
    Hajej, Zied
    Nyoungue, Aime C.
    Abubakar, Aminu S.
    Mohamed Ali, Kammoun
    APPLIED SCIENCES-BASEL, 2021, 11 (09):
  • [37] An integrated supply chain model for new products with imprecise production and supply under scenario dependent fuzzy random demand
    Nagar, Lokesh
    Dutta, Pankaj
    Jain, Karuna
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2014, 45 (05) : 873 - 887
  • [38] Two-echelon imperfect production fuzzy supply chain model for reliability dependent demand with probabilistic deterioration and rework
    Adak, Sudip
    Mahapatra, G. S.
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 41 (02) : 3833 - 3847
  • [39] An integrated production and inventory model considering reworks and two types of demand simultaneously in a two level supply chain network
    Jonrinaldi
    Rahman, T.
    Henmaidi
    Wirdianto, Eri
    Muluk, Asmuliardi
    1ST INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING, 2019, 505
  • [40] Integrated Production-inventory Model in a Multi-echelon Closed-loop Supply Chain with product returns
    Abu-Hassan, Zarina
    Luong, Lee
    Sang-Heon, Lee
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 472-475 : 3305 - 3311