共 24 条
- [1] ANALYSIS OF INFLUENCE OF FCB TEST ON 1000MW STEAM TURBINE SAFETY [J]. PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2014, VOL 14, 2015,
- [2] DESIGN AND SAFETY CONSIDERATIONS FOR A 1000-MW(E) GAS-COOLED FAST-REACTOR [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 20 (APR21): : 468 - 471
- [3] Design and exergy analysis of 1000-MW double-reheat double-turbine regeneration system [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237
- [4] SAFETY EVALUATION OF ISOLATED ISLAND OPERATION ON 1000MW STEAM TURBINE IN NPP [J]. PROCEEDINGS OF ASME 2023 INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, IMECE2023, VOL 7, 2023,
- [5] EFFECTS OF SAFETY ON ECONOMICS IN A 1000-MW(E) LIQUID-METAL-COOLED FAST-BREEDER REACTOR (LMFBR) [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1967, 10 (02): : 694 - &
- [7] CRACKING ANALYSIS OF INTERMEDIATE PRESSURE INLET DIFFUSER IN 1000MW STEAM TURBINE UNITS [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
- [8] Cause Analysis and Treatment of Seawater leaking into Lubricating Oil System of 1000 MW Steam Turbine [J]. 2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252
- [10] Thermal test and economic performance analysis of improved 125MW steam turbine unit [J]. Qilunji Jishu/Turbine Technology, 2000, 42 (05): : 295 - 298