A risk-based availability estimation using Markov method

被引:20
|
作者
Ahmed, Qadeer [1 ]
Khan, Faisal [2 ]
Raza, Syed [3 ]
机构
[1] Mem Univ, Coll Engn & Appl Sci, St John, NF, Canada
[2] Mem Univ, Fac Engn & Appl Sci, St John, NF, Canada
[3] Qatar Univ, Coll Business & Econ, Doha, Qatar
关键词
Availability; Maintainability; Risk assessment; Risk assessment matrix; Markov decision process; Risk-based availability Markov model;
D O I
10.1108/IJQRM-04-2012-0056
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - Asset intensive process industries are under immense pressure to achieve promised return on investments and production targets. This can be accomplished by ensuring the highest level of availability, reliability and utilization of the critical equipment in processing facilities. In order to achieve designed availability, asset characterization and maintainability play a vital role. The most appropriate and effective way to characterize the assets in a processing facility is based on risk and consequence of failure. The paper aims to discuss these issues. Design/methodology/approach - In this research, a risk-based stochastic modeling approach using a Markov decision process is investigated to assess a processing unit's availability, which is referred as the risk-based availability Markov model (RBAMM). RBAMM will not only provide a realistic and effective way to identify critical assets in a plant but also a method to estimate availability for efficient planning purposes and resource optimization. Findings - A unique risk matrix and methodology is proposed to determine the critical equipment with direct impact on the availability, reliability and safety of the process. A functional block diagram is then developed using critical equipment to perform efficient modeling. A Markov process is utilized to establish state diagrams and create steady-state equations to calculate the availability of the process. RBAMM is applied to natural gas absorption process to validate the proposed methodology. In the conclusion, other benefits and limitations of the proposed methodology are discussed. Originality/value - A new risk-based methodology integrated with Markov model application of the methodology is demonstrated using a real-life application.
引用
收藏
页码:106 / +
页数:24
相关论文
共 50 条
  • [41] A Risk-based Criticality Analysis in Bioenergy Parks using P-graph Method
    Benjamin, Michael Francis D.
    Cayamanda, Christina D.
    Belmonte, Beatriz A.
    Tan, Raymond R.
    Razon, Luis F.
    PRES2016: 19TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELING AND OPTIMIZATION FOR ENERGY SAVINGS AND POLLUTION REDUCTION, 2016, 52 : 1243 - 1248
  • [42] Development of a Risk-based Decision Method for Construction Project Evaluation Using Value Theory
    Shah, Liaqat Ali
    Amjad, Fahd
    Vernadat, Francois
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 695 - 700
  • [43] Development of Risk-based Railway Track Maintenance Method Using Image Analysis Technology
    Shimizu A.
    Miwa M.
    Quarterly Report of RTRI (Railway Technical Research Institute), 2019, 60 (04) : 262 - 267
  • [44] MARKOV-BASED EIGENANALYSIS METHOD FOR FREQUENCY ESTIMATION
    ERIKSSON, A
    STOICA, P
    SODERSTROM, T
    IEEE TRANSACTIONS ON SIGNAL PROCESSING, 1994, 42 (03) : 586 - 594
  • [45] Software Reliability Estimation Method Based on Markov Usage Models Using Importance Sampling
    Zhang, Deping
    Wang, Shuai
    Zhou, Wujie
    2012 IEEE FIFTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI), 2012, : 64 - 71
  • [46] Risk-Based Asset Allocation Under Markov-Modulated Pure Jump Processes
    Meng, Hui
    Siu, Tak Kuen
    STOCHASTIC ANALYSIS AND APPLICATIONS, 2014, 32 (02) : 191 - 206
  • [47] An efficient security risk estimation technique for Risk-based access control model for IoT
    Atlam, Hany F.
    Wills, Gary B.
    INTERNET OF THINGS, 2019, 6
  • [48] Risk-Based Dynamic Identity Authentication Method Based on the UCON Model
    Liu, Jing
    Liu, Rongchao
    Lai, Yingxu
    SECURITY AND COMMUNICATION NETWORKS, 2022, 2022
  • [49] Estimation of Shutdown Schedule to Remove Fouling Layers of Heat Exchangers Using Risk-Based Inspection (RBI)
    Elwerfalli, Abdelnaser
    Alsadaie, Salih
    Mujtaba, Iqbal M.
    PROCESSES, 2021, 9 (12)
  • [50] ESTIMATION OF RISK-BASED ON MULTIPLE EVENTS IN RADIATION CARCINOGENESIS OF RAT SKIN
    BURNS, FJ
    JIN, Y
    GARTE, SJ
    HOSSELET, S
    LIFE SCIENCES AND SPACE RESEARCH XXV(2): RADIATION BIOLOGY, 1994, 14 (10): : 507 - 519