MDA PLANNER - INTERACTIVE PLANNING TOOL USING PRODUCT MODELS AND CONSTRUCTION METHODS

被引:0
|
作者
JAGBECK, A
机构
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The aim of the project was to devise a model for computer aids for planning and control, adapted to the working conditions on a building site. The planner meets an interactive environment with integrated tools: a product model produced in the design phase, a methods' tool in which planning knowledge is stored as generic plans, a tool for finding and assigning resources, a planning tool for configuring schedules, and a monitoring diary. Plans on any level of detail can be tailored by pointing out building objects in the product model and combining them with resources. Given these facts, the system automatically generates activities and schedules them according to pre- and postconditions related to the results. Activities are not dependent on each other, thus allowing the planner to substitute one method for another without disturbing the structure of the schedule. Monitored data-the actual state-can be used for revising plans as well as for gathering new knowledge about methods.
引用
收藏
页码:536 / 555
页数:20
相关论文
共 50 条
  • [41] USING A TRUTH-MAINTENANCE SYSTEM TO ASSIST PRODUCT-MODEL CONSTRUCTION FOR DESIGN AND PROCESS PLANNING
    INUI, M
    KIMURA, F
    COMPUTER-AIDED DESIGN, 1993, 25 (01) : 59 - 70
  • [42] Product Variety Management Using Data-Mining Methods - Reducing Planning Complexity by Applying Clustering Analysis on Product Portfolios
    Hochdorffer, J.
    Laule, C.
    Lanza, G.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 593 - 597
  • [43] A Decision Support Tool for Generation Expansion Planning in Competitive Markets using System Dynamics Models
    Pereira, A. J. C.
    Saraiva, J. T.
    2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 3059 - +
  • [44] Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System
    Silveira, Bruno Falcon
    Costa, Dayana Bastos
    CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (04): : 1005 - 1025
  • [45] Interactive response surface approaches using computationally intensive models for multiobjective planning of lake water quality remediation
    Castelletti, A.
    Antenucci, J. P.
    Limosani, D.
    Thi, X. Quach
    Soncini-Sessa, R.
    WATER RESOURCES RESEARCH, 2011, 47
  • [46] Construction of Models for Predicting the Microstructure of Steels after Heat Treatment Using Machine Learning Methods
    Gafarov M.F.
    Okishev K.Y.
    Makovetskiy A.N.
    Pavlova K.P.
    Gafarova E.A.
    Steel in Translation, 2023, 53 (11) : 1120 - 1129
  • [47] Construction of Analytical Curve Fit Models for Simvastatin using Ordinary and Weighted Least Squares Methods
    Marques-Marinho, Flavia D.
    Reis, Ilka A.
    Vianna-Soares, Cristina D.
    JOURNAL OF THE BRAZILIAN CHEMICAL SOCIETY, 2013, 24 (09) : 1469 - U257
  • [48] METHODS OF STUDYING THE ALGORITHM OF CONSTRUCTION MATHEMATICAL MODELS BY THE METHOD OF LEAST SQUARES USING COMPUTER TECHNIQUE
    Ovsienko, Y.
    Flegantov, L.
    INFORMATION TECHNOLOGIES AND LEARNING TOOLS, 2010, 18 (04)
  • [49] TOOL PLANNING IN MULTIPLE PRODUCT-MIX UNDER CYCLE TIME CONSTRAINTS FOR WAFER FOUNDRIES USING GENETIC ALGORITHM
    Hsiung, Yai
    Wu, Muh-Cherng
    Hsu, Hsi-Mei
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (02) : 174 - 183
  • [50] CONSTRUCTION OF POLYNOMIAL-MODELS OF THE ELECTRIC PARAMETERS OF RECTANGULAR T-RIDGE WAVEGUIDES BY METHODS OF EXPERIMENT PLANNING-THEORY
    ALEKSEYEV, YV
    ZHELEZOVSKIY, BE
    KAPITONOVA, TA
    SHNEIDER, ME
    TELECOMMUNICATIONS AND RADIO ENGINEERING, 1981, 35-6 (06) : 112 - 114