Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction A factor analysis approach

被引:10
|
作者
Chan, Joseph [1 ]
Chan, Daniel [1 ]
Chan, Albert [2 ]
Lam, Patrick [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Fac Construct & Environm, Hong Kong, Peoples R China
关键词
Hong Kong; Construction industry; Contracts; Costs; Guaranteed maximum price contracts (GMP); Target cost contracts (TCC); Risk mitigation strategies; Factor analysis;
D O I
10.1108/14725961211200379
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - There is a lack of empirical research on risk mitigation strategies for those construction projects procured by guaranteed maximum price contracts (GMP) and target cost contracts (TCC). The paper aims to identify and analyse the risk mitigation strategies for GMP/TCC construction projects from the Hong Kong perspective. Design/methodology/approach - A total of 94 industrial practitioners with both sound knowledge and abundant hands-on experience of the GMP/TCC methodology participated in an industry-wide empirical questionnaire survey to indicate their levels of agreement on those 18 risk mitigation strategies identified from reported literature and in-depth interviews which were later analysed by factor analysis. Findings - The results of factor analysis revealed that the 18 individual risk mitigation strategies can be consolidated into seven underlying grouped factors: relational contracting and mutual trust; clear contract provisions and well-defined scope of works; involvement of contractor in decision making process; right selection of project team; third party review of project design at tender stage; standard contract clauses for GMP/TCC schemes; and fair treatment of contractor. Research limitations/implications - Although both GMP/TCC contracts have been increasingly popular in the construction market of Hong Kong, not all of these projects have been equally successful and some of them have been exposed to very high risks or uneven allocation of risks. A detailed analysis and an implementation of recommended effective risk mitigation strategies are essential to the success of GMP/TCC schemes. Originality/value - The research findings of this study are expected to help the decision makers to generate useful insights into risk mitigation strategies when administering GMP/TCC contracts at an early stage of project delivery and lay a solid foundation for further research on GMP/TCC in both local and international contexts.
引用
收藏
页码:6 / +
页数:21
相关论文
共 22 条
  • [1] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Yeung, John
    JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) : 34 - +
  • [2] Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 495 - 507
  • [3] An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (05) : 577 - 590
  • [4] A CRITICAL STUDY OF RISK ALLOCATION IN GUARANTEED MAXIMUM PRICE AND TARGET COST CONTRACTS IN HONG KONG
    Chan, Joseph H. L.
    Chan, Daniel W. M.
    Lam, Patrick T. I.
    PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 205 - 215
  • [5] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [6] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in South Australia
    Chan, Daniel
    Chan, Joseph
    Ma, Tony
    FACILITIES, 2014, 32 (11-12) : 624 - 646
  • [7] Risk management in guaranteed maximum price (GMP) contracts
    Palihakkara, Asha Dulanjalie
    Perera, B. A. K. S.
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2022, 11 (02) : 368 - 386
  • [8] Project Cost Implications of Competitive Guaranteed Maximum Price Contracts
    Tran, Dai Q.
    Brihac, Alex
    Nguyen, Long D.
    Kwak, Young Hoon
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)
  • [9] Preferred risk allocation in target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Lam, Patrick
    Chan, Albert
    FACILITIES, 2011, 29 (13-14) : 542 - +
  • [10] Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Yeung, John F. Y.
    Chan, Joseph H. L.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) : 751 - 763