MEDIUM TERM PRODUCTION PLANNING WITH MINIMUM LOT SIZES

被引:2
|
作者
STADTLER, H
机构
关键词
D O I
10.1080/00207548808947884
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:553 / 566
页数:14
相关论文
共 50 条
  • [2] The Maximum Flow Problem with Minimum Lot Sizes
    Haugland, Dag
    Eleyat, Mujahed
    Hetland, Magnus Lie
    [J]. COMPUTATIONAL LOGISTICS, 2011, 6971 : 170 - +
  • [3] Hybrid heuristics for planning lot setups and sizes
    Clark, AR
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (04) : 545 - 562
  • [4] Parallel algorithms for the maximum flow problem with minimum lot sizes
    Eleyat, Mujahed
    Haugland, Dag
    Hetland, Magnus Lie
    Natvig, Lasse
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 83 - 88
  • [5] Mathematical models for capacitated multi-level production planning problems with linked lot sizes
    Wu, Tao
    Shi, Leyuan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (20) : 6227 - 6247
  • [6] Medium-term planning for thermal electricity production
    Kovacevic, Raimund M.
    Paraschiv, Florentina
    [J]. OR SPECTRUM, 2014, 36 (03) : 723 - 759
  • [7] Medium-term planning for thermal electricity production
    Raimund M. Kovacevic
    Florentina Paraschiv
    [J]. OR Spectrum, 2014, 36 : 723 - 759
  • [8] CAPACITATED LOT-SIZING WITH MINIMUM BATCH SIZES AND SETUP TIMES
    ANDERSON, EJ
    CHEAH, BS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 : 137 - 152
  • [9] The optimal trade credit term and production lot sizes considering shortage cost in manufacturing industry
    Guang, Yang
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ENGINEERING MANAGEMENT, ENGINEERING EDUCATION AND INFORMATION TECHNOLOGY, 2015, 36 : 543 - 546
  • [10] Scheduling economic lot sizes in deteriorating production systems
    Giri, BC
    Moon, I
    Yun, WY
    [J]. NAVAL RESEARCH LOGISTICS, 2003, 50 (06) : 650 - 661