Slovene Ethnographic Museum: SEM, a case study

被引:1
|
作者
Krainer, Ales [1 ]
Perdan, Rudi [1 ]
Krainer, Gal [2 ]
机构
[1] Univ Ljubljana, Fac Civil Engn, SI-1000 Jamova, Slovenia
[2] TTGI, Ljubljana, Slovenia
关键词
Heating; Cooling; Daylight; Control system; Monitoring;
D O I
10.1080/14786450600921439
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents the technological part of activities executed in the framework of MUSEUMS Project Slovene Ethnographic Museum, Ljubljana, Slovenia. There were two main fields of interventions: construction with new envelope design, new heating-cooling wall panel system, which replaced the originally designed air condition system and ventilation which is used for physiological and cooling purposes, and a control and management system which takes care of the best possible harmonization of the demands on the temperature, humidity and air quality level upgraded with a permanent monitoring system. We are obliged to stress, being aware of the environment in which this paper will appear, that the success of such projects depends on extensive collaboration of all involved partners from the very beginning.
引用
收藏
页码:131 / 151
页数:21
相关论文
共 50 条