The case for feedback control real-time scheduling

被引:69
|
作者
Stankovic, JA [1 ]
Lu, CY [1 ]
Son, SH [1 ]
Tao, G [1 ]
机构
[1] Univ Virginia, Dept Comp Sci, Charlottesville, VA 22903 USA
关键词
D O I
10.1109/EMRTS.1999.777445
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Despite the significant body of results in real-time scheduling, many real world problems are not easily supported. While algorithms such as Earliest Deadline First, Rate Monotonic, and the Spring scheduling algorithm can support sophisticated task set characteristics (such as deadlines, precedence constraints, shared resources, jitter, etc.), they are all "open loop" scheduling algorithms. Open loop refers to the fact that once schedules are created they are not "adjusted" based on continuous feedback. While open-loop scheduling algorithms can perform well in static or dynamic systems in which the workloads can be accurately modeled, they can perform poorly in unpredictable dynamic systems. In this paper, we present a new scheduling paradigm, which we call feedback control real-time scheduling. Feedback control real-time scheduling defines error terms for schedules, monitors the error, and continuously adjusts the schedules to maintain stable performance. This paper also presents a practical feedback control real-time scheduling algorithm, FC-EDF, which is a starting point in the long-term endeavor of creating a theory and practice of feedback control scheduling.
引用
收藏
页码:11 / 20
页数:10
相关论文
共 50 条
  • [1] Feedback control for real-time scheduling
    Sahoo, DR
    Swaminathan, S
    Al-Omari, R
    Salapaka, MV
    Manimaran, G
    Somani, AK
    [J]. PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 1254 - 1259
  • [2] Feedback control scheduling in distributed real-time systems
    Stankovic, JA
    He, T
    Abdelzaher, T
    Marley, M
    Tao, G
    Son, S
    Lu, CY
    [J]. 22ND IEEE REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2001, : 59 - 70
  • [3] Real-time control systems: feedback, scheduling and robustness
    Simon, Daniel
    Seuret, Alexandre
    Sename, Olivier
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2017, 48 (11) : 2368 - 2378
  • [4] Feedback control real-time scheduling in ORB middleware
    Lu, CY
    Wang, XR
    Gill, C
    [J]. 9TH IEEE REAL-TIME AND EMBEDDED TECHNOLOGY AND APPLICATIONS SYMPOSIUM, PROCEEDINGS, 2003, : 37 - 48
  • [5] NEURAL FEEDBACK SCHEDULING OF REAL-TIME CONTROL TASKS
    Xia, Feng
    Tian, Yu-Chu
    Sun, Youxian
    Dong, Jinxiang
    [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2008, 4 (11): : 2965 - 2975
  • [6] Real-time scheduling based on fuzzy feedback control
    Peng ShuHua
    Su Zhong
    [J]. ICEMI 2007: PROCEEDINGS OF 2007 8TH INTERNATIONAL CONFERENCE ON ELECTRONIC MEASUREMENT & INSTRUMENTS, VOL III, 2007, : 104 - +
  • [7] A Feedback Control Scheduling Architecture for Real-Time Ontology
    Ben Abid, Wided
    Mhiri, Mohamed Ben Ahmed
    Ben Salem, Malek
    Bouazizi, Emna
    Gargouri, Faiez
    [J]. 2017 12TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS AND KNOWLEDGE ENGINEERING (IEEE ISKE), 2017,
  • [8] Task scheduling with feedback latency for real-time control systems
    Kim, BK
    [J]. FIFTH INTERNATIONAL CONFERENCE ON REAL-TIME COMPUTING SYSTEMS AND APPLICATIONS, PROCEEDINGS, 1998, : 37 - 41
  • [9] Feedback scheduling for real-time control of systems with communication delays
    Sename, O
    Simon, D
    Robert, D
    [J]. ETFA 2003: IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2003, : 454 - 461
  • [10] Feedback Scheduling of Real-Time Control Systems with Resource Constraints
    Xia, Feng
    [J]. JOURNAL OF COMPUTER SCIENCE & TECHNOLOGY, 2007, 7 (03): : 263 - 264