首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
A CHANCE-CONSTRAINED INTEGER GOAL PROGRAMMING-MODEL FOR CAPITAL-BUDGETING IN THE PRODUCTION AREA
被引:15
|
作者
:
KEOWN, AJ
论文数:
0
引用数:
0
h-index:
0
KEOWN, AJ
TAYLOR, BW
论文数:
0
引用数:
0
h-index:
0
TAYLOR, BW
机构
:
来源
:
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
|
1980年
/ 31卷
/ 07期
关键词
:
D O I
:
10.2307/2580845
中图分类号
:
C93 [管理学];
学科分类号
:
12 ;
1201 ;
1202 ;
120202 ;
摘要
:
引用
收藏
页码:579 / 589
页数:11
相关论文
共 50 条
[1]
A CHANCE-CONSTRAINED GOAL PROGRAMMING-MODEL FOR CAPITAL-BUDGETING
DE, PK
论文数:
0
引用数:
0
h-index:
0
DE, PK
ACHARYA, D
论文数:
0
引用数:
0
h-index:
0
ACHARYA, D
SAHU, KC
论文数:
0
引用数:
0
h-index:
0
SAHU, KC
[J].
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY,
1982,
33
(07)
: 635
-
638
[2]
INTEGER GOAL PROGRAMMING-MODEL FOR CAPITAL-BUDGETING IN HOSPITALS
KEOWN, AJ
论文数:
0
引用数:
0
h-index:
0
机构:
VIRGINIA POLYTECH INST & STATE UNIV,BLACKSBURG,VA 24061
VIRGINIA POLYTECH INST & STATE UNIV,BLACKSBURG,VA 24061
KEOWN, AJ
MARTIN, JD
论文数:
0
引用数:
0
h-index:
0
机构:
VIRGINIA POLYTECH INST & STATE UNIV,BLACKSBURG,VA 24061
VIRGINIA POLYTECH INST & STATE UNIV,BLACKSBURG,VA 24061
MARTIN, JD
[J].
FINANCIAL MANAGEMENT,
1976,
5
(03)
: 28
-
35
[3]
MULTI-NATIONAL CAPITAL-BUDGETING USING CHANCE-CONSTRAINED GOAL PROGRAMMING
CHOI, TS
论文数:
0
引用数:
0
h-index:
0
机构:
ST LOUIS UNIV, DEPT MANAGEMENT & DECIS SCI, ST LOUIS, MO 63108 USA
ST LOUIS UNIV, DEPT MANAGEMENT & DECIS SCI, ST LOUIS, MO 63108 USA
CHOI, TS
LEVARY, RR
论文数:
0
引用数:
0
h-index:
0
机构:
ST LOUIS UNIV, DEPT MANAGEMENT & DECIS SCI, ST LOUIS, MO 63108 USA
ST LOUIS UNIV, DEPT MANAGEMENT & DECIS SCI, ST LOUIS, MO 63108 USA
LEVARY, RR
[J].
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE,
1989,
20
(03)
: 395
-
414
[4]
A MIXED-INTEGER GOAL PROGRAMMING-MODEL FOR CAPITAL-BUDGETING WITHIN A POLICE DEPARTMENT
TAYLOR, BW
论文数:
0
引用数:
0
h-index:
0
TAYLOR, BW
KEOWN, AJ
论文数:
0
引用数:
0
h-index:
0
KEOWN, AJ
[J].
COMPUTERS ENVIRONMENT AND URBAN SYSTEMS,
1981,
6
(04)
: 171
-
181
[5]
A CHANCE-CONSTRAINED MIXED INTEGER PROGRAMMING-MODEL FOR INTERNAL CONTROL DESIGN
HAMLEN, SS
论文数:
0
引用数:
0
h-index:
0
HAMLEN, SS
[J].
ACCOUNTING REVIEW,
1980,
55
(04):
: 578
-
593
[6]
A ZERO-ONE GOAL PROGRAMMING-MODEL FOR CAPITAL-BUDGETING IN A PROPERTY AND LIABILITY INSURANCE COMPANY
LAWRENCE, KD
论文数:
0
引用数:
0
h-index:
0
机构:
UNIV S CAROLINA,COLL BUSINESS ADM,DEPT MANAGEMENT SCI,COLUMBIA,SC 29208
UNIV S CAROLINA,COLL BUSINESS ADM,DEPT MANAGEMENT SCI,COLUMBIA,SC 29208
LAWRENCE, KD
REEVES, GR
论文数:
0
引用数:
0
h-index:
0
机构:
UNIV S CAROLINA,COLL BUSINESS ADM,DEPT MANAGEMENT SCI,COLUMBIA,SC 29208
UNIV S CAROLINA,COLL BUSINESS ADM,DEPT MANAGEMENT SCI,COLUMBIA,SC 29208
REEVES, GR
[J].
COMPUTERS & OPERATIONS RESEARCH,
1982,
9
(04)
: 303
-
309
[7]
Credibility-based chance-constrained integer programming models for capital budgeting with fuzzy parameters
Huang, Xiaoxia
论文数:
0
引用数:
0
h-index:
0
机构:
Univ Sci & Technol Beijing, Sch Management, Beijing 100083, Peoples R China
Univ Sci & Technol Beijing, Sch Management, Beijing 100083, Peoples R China
Huang, Xiaoxia
[J].
INFORMATION SCIENCES,
2006,
176
(18)
: 2698
-
2712
[8]
A JOINT CHANCE-CONSTRAINED PROGRAMMING-MODEL WITH ROW DEPENDENCE
WATANABE, T
论文数:
0
引用数:
0
h-index:
0
机构:
JOHNS HOPKINS UNIV,DEPT GEOG & ENVIRONM ENGN,BALTIMORE,MD 21218
JOHNS HOPKINS UNIV,DEPT GEOG & ENVIRONM ENGN,BALTIMORE,MD 21218
WATANABE, T
ELLIS, H
论文数:
0
引用数:
0
h-index:
0
机构:
JOHNS HOPKINS UNIV,DEPT GEOG & ENVIRONM ENGN,BALTIMORE,MD 21218
JOHNS HOPKINS UNIV,DEPT GEOG & ENVIRONM ENGN,BALTIMORE,MD 21218
ELLIS, H
[J].
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH,
1994,
77
(02)
: 325
-
343
[9]
CHANCE-CONSTRAINED GOAL PROGRAMMING-MODEL TO EVALUATE RESPONSE RESOURCES FOR MARINE POLLUTION DISASTERS
CHARNES, A
论文数:
0
引用数:
0
h-index:
0
机构:
HARVARD UNIV,GRAD SCH BUSINESS ADM,CAMBRIDGE,MA 02138
CHARNES, A
COOPER, WW
论文数:
0
引用数:
0
h-index:
0
机构:
HARVARD UNIV,GRAD SCH BUSINESS ADM,CAMBRIDGE,MA 02138
COOPER, WW
KARWAN, KR
论文数:
0
引用数:
0
h-index:
0
机构:
HARVARD UNIV,GRAD SCH BUSINESS ADM,CAMBRIDGE,MA 02138
KARWAN, KR
WALLACE, WA
论文数:
0
引用数:
0
h-index:
0
机构:
HARVARD UNIV,GRAD SCH BUSINESS ADM,CAMBRIDGE,MA 02138
WALLACE, WA
[J].
JOURNAL OF ENVIRONMENTAL ECONOMICS AND MANAGEMENT,
1979,
6
(03)
: 244
-
274
[10]
ANALYSIS AND EVALUATION OF A LINEARIZED, CHANCE-CONSTRAINED PROGRAMMING APPROACH TO CAPITAL BUDGETING
HOYLE, RS
论文数:
0
引用数:
0
h-index:
0
机构:
TESORO PETR CORP,SAN ANTONIO,TX 78205
HOYLE, RS
DAWKINS, GS
论文数:
0
引用数:
0
h-index:
0
机构:
TESORO PETR CORP,SAN ANTONIO,TX 78205
DAWKINS, GS
[J].
OPERATIONS RESEARCH,
1975,
23
: B387
-
B387
←
1
2
3
4
5
→