DECISION RULES FOR MULTISTAGE SCHEDULING AT AN ASSEMBLY JOB-SHOP

被引:0
|
作者
GRAVEL, M
PRICE, W
机构
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Usual scheduling rules are not always appropriate in a Kanban assembly job-shop. We present five new heuristic rules that use an analysis of assembly network diagram topology to schedule waiting jobs. The production of a sample of the products of a firm is simulated under different operation conditions. MCDM techniques allow comparison of rules for the optimisation of makespan, stock level, and setups.
引用
收藏
页码:111 / 124
页数:14
相关论文
共 50 条
  • [1] SCHEDULING FOR MACHINING AND ASSEMBLY IN A JOB-SHOP ENVIRONMENT
    DOCTOR, SR
    CAVALIER, TM
    EGBELU, PJ
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (06) : 1275 - 1297
  • [2] JOB-SHOP SCHEDULING
    NEW, C
    [J]. DATA PROCESSING, 1974, 16 (02): : 100 - 102
  • [3] Job-shop scheduling in a body shop
    Joachim Schauer
    Cornelius Schwarz
    [J]. Journal of Scheduling, 2013, 16 : 215 - 229
  • [4] Job-shop scheduling in a body shop
    Schauer, Joachim
    Schwarz, Cornelius
    [J]. JOURNAL OF SCHEDULING, 2013, 16 (02) : 215 - 229
  • [5] SCHEDULING RULES FOR A SMALL DYNAMIC JOB-SHOP: A SIMULATION APPROACH
    Dileepan, P.
    Ahmadi, M.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2010, 9 (04) : 173 - 183
  • [6] An efficient combination of dispatch rules for Job-Shop Scheduling Problem
    Kawai, T
    Fujimoto, Y
    [J]. 2005 3RD IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS (INDIN), 2005, : 484 - 488
  • [7] GA with Priority Rules for Solving Job-Shop Scheduling Problems
    Hasan, S. M. Kamrul
    Sarker, Ruhul
    Cornforth, David
    [J]. 2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 1913 - 1920
  • [8] SCHEDULING THE GENERAL JOB-SHOP
    BARKER, JR
    MCMAHON, GB
    [J]. MANAGEMENT SCIENCE, 1985, 31 (05) : 594 - 598
  • [9] ON THE JOB-SHOP SCHEDULING PROBLEM
    MANNE, AS
    [J]. OPERATIONS RESEARCH, 1960, 8 (02) : 219 - 223
  • [10] Hybrid approach to decision-making for job-shop scheduling
    Mesghouni, K
    Pesin, P
    Trentesaux, D
    Hammadi, S
    Tahon, C
    Borne, P
    [J]. PRODUCTION PLANNING & CONTROL, 1999, 10 (07) : 690 - 706