共 16 条
- [1] RATIONALIZATION OF TUNDISH SERVICE AT NO-1 STEEL MAKING PLANT OF YAWATA WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S248 - S248
- [2] NETWORKED ONLINE COMPUTER-SYSTEM FOR EXISTING RAIL AND SECTION MILL AT YAWATA-WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1173 - 1173
- [4] RECONSTRUCTION AND OPERATION OF DH EQUIPMENT OF NO-1 STEELMAKING PLANT AT YAWATA-WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S978 - S978
- [6] NEW COMPUTER CONTROL-SYSTEM OF HOT STRIP MILL IN MURORAN WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S313 - S313
- [7] COILING TEMPERATURE CONTROL-SYSTEM OF YAWATA HOT STRIP MILL, NIPPON-STEEL-CORP .2. COILING TEMPERATURE CONTROL BY APPLICATIONS OF OBSERVER [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1107 - 1107
- [8] CAST CONTROL-SYSTEM ON SAKAI NO-2 BLAST-FURNACE OF NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S864 - S864
- [9] COILING TEMPERATURE CONTROL-SYSTEM OF YAWATA HOT STRIP MILL, NIPPON-STEEL-CORP .1. DEVELOPMENT OF COILING TEMPERATURE CONTROL-SYSTEM WITH INDEPENDENT CONTROL BY ROT (RUN OUT TABLE) COOLING SECTION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1106 - 1106
- [10] PRODUCTION CONTROL-SYSTEM FOR DIRECT-LINKED PROCESS BETWEEN CONTINUOUS CASTERS AND HOT STRIP MILL OR PLATE MILL AT OITA WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 74 (07): : 1323 - 1330