ADDRESSING THE GAP IN SCHEDULING RESEARCH - A REVIEW OF OPTIMIZATION AND HEURISTIC METHODS IN PRODUCTION SCHEDULING

被引:207
|
作者
MACCARTHY, BL
LIU, JY
机构
[1] Department of Manufacturing Engineering and Operations Management, University of Nottingham, University Park, Nottingham
关键词
D O I
10.1080/00207549308956713
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the gap between scheduling theory and scheduling practice. The development and the main results of classical scheduling theory are reviewed and presented in an easily accessible way. Recent trends in scheduling research which attempt to make it more relevant and applicable are described. The nature of the gap between theory and practice is discussed. The failure of classical scheduling theory to address the total environment within which the scheduling function operates is noted. However, scheduling research in operations management and manufacturing systems tends to ignore the rich vein of methods, techniques and results in the classical theory. The need for an integrated scheduling research effort, containing elements of both approaches, is stressed.
引用
收藏
页码:59 / 79
页数:21
相关论文
共 50 条
  • [1] HEURISTIC METHODS OF PRODUCTION SCHEDULING
    BERA, H
    ATHERTON, MA
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING, 1988, : 205 - 209
  • [2] AN APPROACH TO OPTIMIZATION WITH HEURISTIC METHODS OF SCHEDULING
    CLIFFE, RW
    MACMANUS, BR
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (04) : 479 - 490
  • [3] Improvement of Production Process Scheduling with the Use of Heuristic Methods
    Musial, Kamil
    Gornicka, Dagmara
    Burduk, Anna
    [J]. INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE, 2019, 835 : 195 - 204
  • [4] Research on the Production Scheduling Optimization for Virtual Enterprises
    Huang, Min
    Huang, Ruixian
    Sun, Bo
    Li, Linrong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [5] An optimization heuristic for the berth scheduling problem
    Lee, Yusin
    Chen, Chuen-Yih
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (02) : 500 - 508
  • [6] An ant colony optimization heuristic for an integrated production and distribution scheduling problem
    Chang, Yung-Chia
    Li, Vincent C.
    Chiang, Chia-Ju
    [J]. ENGINEERING OPTIMIZATION, 2014, 46 (04) : 503 - 520
  • [7] Research on Production Scheduling Optimization with Utilization Ratio of Equipments
    Li Fang
    Wang Yu
    Zhong Yingchun
    Tan Zhi
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 3177 - +
  • [8] ADDRESSING N-1 SCHEDULING PROBLEM - HEURISTIC APPROACH
    DAVIS, KR
    WALTERS, JE
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1977, 4 (02) : 89 - 100
  • [9] A heuristic dynamic optimization algorithm for irrigation scheduling
    Naadimuthu, G
    Raju, KS
    Lee, ES
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 1999, 30 (7-8) : 169 - 183
  • [10] EFFICIENT HEURISTIC OPTIMIZATION IN SINGLE MACHINE SCHEDULING
    Braune, Roland
    Affenzeller, Michael
    Wagner, Stefan
    [J]. INTERNATIONAL MEDITERRANEAN MODELLING MULTICONFERENCE 2006, 2006, : 499 - 504