共 50 条
- [2] CONSIDERATIONS IN MAKING ENGINEERING-CONTRACT ARRANGEMENTS [J]. MECHANICAL ENGINEERING, 1980, 102 (07): : 69 - 69
- [3] Talks start on new consultant contract [J]. BMJ-BRITISH MEDICAL JOURNAL, 1999, 318 (7195): : 1425 - 1425
- [7] WOMAD - the use of NEC-EEC (New Engineering Contract - Engineering Construction Contract) on a major decommissioning contract [J]. NUCLEAR DECOM 2001: ENSURING SAFE, SECURE, AND SUCCESSFUL DECOMMISSIONING, 2001, 2001 (08): : 223 - 232