Determinants of construction labour productivity in Oman

被引:47
|
作者
Jarkas, Abdulaziz M. [1 ]
Al Balushi, Rashid A. [2 ]
Raveendranath, P. K. [2 ]
机构
[1] Al Mazaya Holding Co, Projects Dept, KSCP, Kuwait, State Of Kuwait, Kuwait
[2] Engn Innovat Design & Consulting, Muscat, Oman
关键词
construction labour productivity; efficiency; operatives; contractors; Sultanate of Oman;
D O I
10.1080/15623599.2015.1094849
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Notwithstanding the technological developments, construction continues to be a labour-intensive industry, and hence labour productivity remains the industry's predominant determinant of performance. One of the primary challenges facing the construction industry in the Sultanate of Oman is low labour productivity. Therefore, the objective of this study is to identify, explore and rank the relative importance of the cardinal determinants of construction labour productivity in Oman. A statistically representative sample of contractors was thus invited to participate in a structured questionnaire survey comprising 33 productivity factors. Using the relative importance index technique, the findings distinguish the following factors as most significant: (1) errors and omission in design drawings; (2) changes to orders during execution; (3) delay in responding to requests for information; (4) lack of labour supervision; (5) clarity of project specifications; (6) coordination level amongst design disciplines; (7) working overtime; (8) rework; (9) inclement weather; and (10) physical fatigue. The outcomes not only fill a gap in knowledge of the critical determinants of labour productivity in the Sultanate, but may also be used by academics and industry practitioners to develop a deeper and wider perspective on the factors influencing the efficiency of the construction labour force.
引用
收藏
页码:332 / 344
页数:13
相关论文
共 50 条
  • [1] Measuring labour productivity in construction firms
    Fox, Paul W.
    Gilleard, John D.
    [J]. Hong Kong Engineer, 1992, 20 (02):
  • [2] Agricultural Labour Productivity and Its Determinants in India
    Shanmugan, K.
    Baria, Bhagirath Prakash
    [J]. INDIAN JOURNAL OF LABOUR ECONOMICS, 2019, 62 (03): : 431 - 449
  • [3] Agricultural Labour Productivity and Its Determinants in India
    K. Shanmugan
    Bhagirath Prakash Baria
    [J]. The Indian Journal of Labour Economics, 2019, 62 : 431 - 449
  • [4] Decomposition of temporal changes in construction labour productivity
    Ma, Le
    Liu, Chunlu
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (01) : 65 - 77
  • [5] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [6] Construction labour productivity: review of factors identified
    Hamza, Mohammed
    Shahid, Shamsuddin
    Bin Hainin, Mohd Rosli
    Nashwan, Mohamed Salem
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 413 - 425
  • [7] System model for analysing construction labour productivity
    Tsehayae, Abraham Assefa
    Fayek, Aminah Robinson
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2016, 16 (02): : 203 - 228
  • [8] The Impact of Construction Labour Productivity on the Renovation Wave
    Wandahl, Soren
    Perez, Christina T.
    Salling, Stephanie
    Neve, Hasse H.
    Lerche, Jon
    Petersen, Steffen
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2021, 21 (03): : 11 - 32
  • [9] Measuring Labour Productivity in Labour Intensive Works on the Road Construction in Ghana
    Bamfo-Agyei, Emmanuel
    Aigbavboa, Clinton
    Didibhuku, Thwala Welligton
    [J]. ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 515 - 523
  • [10] DETERMINANTS OF LABOUR PRODUCTIVITY CONVERGENCE IN THE EUROPEAN AGRICULTURAL SECTOR
    Carmen Cuerva, Maria
    [J]. AGROCIENCIA, 2012, 46 (06) : 621 - 635