A two-stage stochastic programming model for phlebotomist scheduling in hospital laboratories

被引:2
|
作者
Leaven, Laquanda [1 ]
Qu, Xiuli [2 ]
机构
[1] North Carolina A&T State Univ, Coll Business & Econ, Dept Mkt Transportat & Supply Chain, Greensboro, NC 27411 USA
[2] North Carolina A&T State Univ, Coll Engn, Dept Ind & Syst Engn, Greensboro, NC USA
关键词
Scheduling; laboratory; work overload; stochastic programming;
D O I
10.1057/s41306-017-0033-8
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
This paper introduces a two-stage stochastic integer linear programming model to improve phlebotomist scheduling in laboratory facilities of healthcare delivery systems. The model developed enables laboratory management to determine optimal scheduling policies that minimize work overload. The stochastic programming model considers the uncertainty associated with the blood collection demand in laboratory environments when optimizing phlebotomist scheduling. The paper presents an application of the model to a hospital laboratory in urban North Carolina as a case study discussing the implications for hospital laboratory management.
引用
收藏
页码:100 / 110
页数:11
相关论文
共 50 条
  • [1] A Two-stage Stochastic Programming Model for Outpatient Appointment Scheduling
    Ma Shuang
    Chen Songlin
    Cai Xiaotian
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 79 - 83
  • [2] A two-stage stochastic programming model for scheduling replacements in sow farms
    Rodriguez, Sara V.
    Albornoz, Victor M.
    Pla, Lluis M.
    [J]. TOP, 2009, 17 (01) : 171 - 189
  • [3] A two-stage stochastic programming model for scheduling replacements in sow farms
    Sara V. Rodríguez
    Victor M. Albornoz
    Lluís M. Plà
    [J]. TOP, 2009, 17 : 171 - 189
  • [4] A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty
    Hu, Zhengyang
    Hu, Guiping
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 180 : 198 - 207
  • [5] A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity
    Al-Khamis, Talal
    M'Hallah, Rym
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) : 1747 - 1759
  • [6] A two-stage stochastic programming project scheduling approach to production planning
    Alfieri, Arianna
    Tolio, Tullio
    Urgo, Marcello
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4): : 279 - 290
  • [7] A two-stage stochastic programming project scheduling approach to production planning
    Arianna Alfieri
    Tullio Tolio
    Marcello Urgo
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 62 : 279 - 290
  • [8] TWO-STAGE CONTINUOUS STOCHASTIC PROGRAMMING MODEL FOR FINANCIAL PLANNING
    Uspuriene, Ana
    Sakalauskas, Leonidas
    [J]. 6TH INTERNATIONAL SCIENTIFIC CONFERENCE BUSINESS AND MANAGEMENT 2010, VOLS I AND II, 2010, : 263 - 269
  • [9] A two-stage stochastic programming model for electric energy producers
    Beraldi, Patrizia
    Conforti, Domenico
    Violi, Antonio
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) : 3360 - 3370
  • [10] Two-Stage Stochastic Programming Model for Market Clearing With Contingencies
    Saric, Andrija T.
    Murphy, Frederic H.
    Soyster, Allen L.
    Stankovic, Aleksandar M.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (03) : 1266 - 1278