SCHEDULING WITH TIME WINDOWS AND SOLUTION SET RESTRICTION

被引:0
|
作者
WITTIG, WS
机构
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:259 / 270
页数:12
相关论文
共 50 条
  • [1] An exact solution approach for vehicle routing and scheduling problems with soft time windows
    Qureshi, A. G.
    Taniguchi, E.
    Yamada, T.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2009, 45 (06) : 960 - 977
  • [2] Aircraft and gate scheduling with time windows
    Zhu, Y
    Lim, A
    Rodrigues, B
    15TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2003, : 189 - 193
  • [3] Airport Gate Scheduling with Time Windows
    A. Lim
    B. Rodrigues
    Y. Zhu
    Artificial Intelligence Review, 2005, 24 : 5 - 31
  • [4] VEHICLES SCHEDULING WITH SLIDING TIME WINDOWS
    FERLAND, JA
    FORTIN, L
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) : 213 - 226
  • [5] Crossdocking - JIT scheduling with time windows
    Li, Y
    Lim, A
    Rodrigues, B
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (12) : 1342 - 1351
  • [6] Airport gate scheduling with time windows
    Lim, A
    Rodrigues, B
    Zhu, Y
    ARTIFICIAL INTELLIGENCE REVIEW, 2005, 24 (01) : 5 - 31
  • [7] PREEMPTIVE SCHEDULING ALGORITHMS WITH NESTED PROCESSING SET RESTRICTION
    Huo, Yumei
    Leung, Joseph Y-T
    Wang, Xin
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2009, 20 (06) : 1147 - 1160
  • [8] SET TIME WINDOWS WITHIN A CLOCK
    MATSUNAGA, D
    ELECTRONIC DESIGN, 1994, 42 (23) : 115 - 116
  • [9] Integrated scheduling of production and delivery with time windows
    Low, Chinyao
    Li, Rong-Kwei
    Chang, Chien-Min
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) : 897 - 909
  • [10] The selection and scheduling of telecommunication calls with time windows
    Amiri, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) : 243 - 256