Mechanism analysis of stability of cut-and-fill roadbed interface

被引:0
|
作者
Su Yong-hua [1 ]
Xie Zhi-yong [1 ]
Xu Neng-xiong [2 ]
Ouyang Guan-qian [1 ]
机构
[1] Hunan Univ, Coll Civil Engn, Changsha 410082, Hunan, Peoples R China
[2] China Univ Geosci, Sch Engn & Technol, Beijing 100083, Peoples R China
关键词
slope; cut-and-fill roadbed; interface; MSarma method; orthogonal design; sensitivity priority;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The influence factors of the interface on the cut-and-fill roadbed are studied; and reducing these to two kinds as a whole, geometrical features and physico-mechanical parameters. The characteristics of interface step and the discrepancy of the filling physico-mechanical parameters are researched; and it is indicated that there are limitations in the imbalanced thrust method, such as in plotting slices and there is error in the count result. So the author illuminates that the imbalanced thrust method is unsuitable to be used in analyzing the stability of cut-and-fill roadbed basing on interface. And the MSarma method which is developed freshly to replace the imbalanced thrust method is recommended. Based on mass of cut-and-fill roadbed interfaces in a highway and combining the orthogonal design, statistic method and MSarma method, the mechanical mechanism analytical method for analyzing the stability of cut-and-fill roadbed interface is formed. This method is used to analyse the stability of cut-and-fill roadbed interface in three different cases; and the sensitivity priority of each factor to stability coefficient of roadbed is also given; the rank top 4 are cohesive force, internal friction angle, interface and roadbed obliquity; and then the selecting principle of filling, interface parameters and the form of roadbed is advanced, which is based on the study of the quantity relation between the four parameters and stability coefficient and comparing the variety trend.
引用
收藏
页码:497 / 502
页数:6
相关论文
共 10 条
  • [1] [邓卫东 Deng Weidong], 2004, [中国公路学报, China Journal of Highway and Transport], V17, P12
  • [2] Ding ZX, 2007, ROCK SOIL MECH, V28, P269
  • [3] JIANG Xin, 2006, HYDROLOGY ENG GEOLOG, P16
  • [4] [苗英豪 Miao Yinghao], 2005, [交通运输工程学报, Journal of triffic and transportation engineering], V5, P43
  • [5] [时卫民 Shi Weimin], 2004, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V26, P313
  • [6] [苏永华 SU Yonghua], 2006, [水利学报, Journal of Hydraulic Engineering], V37, P457
  • [7] Xu GS, 2007, ROCK SOIL MECH, V28, P1435
  • [8] YAO Ai-jun, 2003, CHINA CIVIL ENG J, V23, P34
  • [9] [郑颖人 Zheng Yingren], 2004, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V23, P3030
  • [10] [周志刚 Zhou Zhigang], 2002, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V24, P576