Research on estimation modle of post construction settlement for soft ground

被引:0
|
作者
Lue Xiu-jie [1 ]
机构
[1] Jiaxing Univ, Coll Civil Engn & Architecture, Jiaxing 314001, Peoples R China
关键词
soft ground; post construction settlement; hyperbola model; half-cube relationship;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Estimation of the post construction settlemen is one of the most critical problems in expressway. Exponential curve method and hyperbola method is the most common method in the previous research; but the estimation results from the former model tend to be the smaller and those from the latter model tend to be larger. Based on analytical results, a kind of hyperbola model is proposed that the relationship between the settlement rate and the settlement seems as half-cube nonlinear behavior. Theoretical analysis and engineering case application prove that the estimation results of the new model are placed in those of two kinds models in common use; and they are close to the average. It is shown that the reliability of the estimation results is a little higher than the other two models.
引用
收藏
页码:2091 / +
页数:6
相关论文
共 8 条
  • [1] Asaoka A., 1978, SOILS FOUND, V18, P87, DOI [10.3208/sandf1972.18.4_87, DOI 10.3208/SANDF1972.18.4_87]
  • [2] [曾国强 Cao Goqiang], 2003, [岩土力学, Rock and Soil Mechanics], V24, P467
  • [3] [黄广军 HUANG GuangJun], 2007, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V29, P811
  • [4] Lei X.W., 2000, ROCK SOIL MECH, V21, P145
  • [5] [李涛 Li Tao], 2003, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V25, P724
  • [6] [李涛 LI Tao], 2005, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V24, P3282
  • [7] [王志亮 Wang Zhiliang], 2004, [岩土力学, Rock and Soil Mechanics], V25, P901
  • [8] ZHANG liu-jun, 2006, J HIGHWAY TRANSPORTA, V23, P7