NATURE AND USEFULNESS OF SIMULATION AS IT APPLIES TO EQUIPMENT SELECTION AT AN OPEN-PIT MINE

被引:0
|
作者
JOLLEY, DR
机构
来源
CANADIAN MINING AND METALLURGICAL BULLETIN | 1970年 / 63卷 / 702期
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
引用
收藏
页码:1176 / &
相关论文
共 50 条
  • [1] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [2] AN EVALUATION OF EQUIPMENT SELECTION FOR OPEN-PIT MINING
    JOLLEY, DR
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1970, 63 (695): : 297 - &
  • [3] Research on the Equipment Addition of Antaibao Open-pit Mine
    Yang, Zhao
    Zhang, Ruixin
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 619 - 623
  • [4] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [5] Route selection algorithm of open-pit mine transportation system
    Liu G.
    Chai S.
    Bai R.
    Zhao J.
    Li H.
    Zhang J.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (12): : 3931 - 3940
  • [6] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [7] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [8] Solving Challenges at an Open-Pit Mine
    GPS World, 2021, 32 (04): : 24 - 25
  • [9] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [10] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &