WORK-REST CYCLE IN AIRCREWMEN FATIGUE

被引:0
|
作者
DEHART, RL
机构
来源
AEROSPACE MEDICINE | 1967年 / 38卷 / 11期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1174 / +
页数:1
相关论文
共 50 条
  • [1] Breaking the Fatigue Cycle: Investigating the Effect of Work-Rest Schedules on Muscle Fatigue in Material Handling Jobs
    Beltran Martinez, Karla
    Nazarahari, Milad
    Rouhani, Hossein
    SENSORS, 2023, 23 (24)
  • [2] PROLONGED HUMAN PERFORMANCE AS A FUNCTION OF WORK-REST CYCLE
    ADAMS, OS
    CHILES, WD
    AEROSPACE MEDICINE, 1963, 34 (02): : 132 - &
  • [3] ARRANGEMENT OF WORK-REST CYCLE OF COSMONAUTS IN SPACE-FLIGHT
    ALYAKRINSKY, BS
    KOSMICHESKAYA BIOLOGIYA I AVIAKOSMICHESKAYA MEDITSINA, 1980, 14 (01): : 3 - 8
  • [4] Comfortable Environments for Mental Work By Suitable Work-rest schedule: Mental Fatigue and Relaxation
    Chen, L. L.
    Sugi, T.
    Shirakawa, S.
    Zou, J. Z.
    Nakamura, M.
    2008 6TH IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, VOLS 1-3, 2008, : 338 - +
  • [5] Minimizing fatigue during repetitive jobs: Optimal work-rest schedules
    Wood, DD
    Fisher, DL
    Andres, RO
    HUMAN FACTORS, 1997, 39 (01) : 83 - 101
  • [6] Fatigue, work-rest cycles, and psychomotor performance of New Zealand truck drivers
    Charlton, SG
    Baas, PH
    NEW ZEALAND JOURNAL OF PSYCHOLOGY, 2001, 30 (01) : 32 - 39
  • [7] Work-rest schedules for data entry operators
    Balci, R
    Aghazadeh, F
    Waly, SM
    ADVANCES IN OCCUPATIONAL ERGONOMICS AND SAFETY, VOL 2, 1998, 2 : 155 - 158
  • [8] Work-rest regimens for work in hot environments: A scoping review
    Deshayes, Thomas A.
    Hsouna, Hsen
    Braham, Mounir A. A.
    Arvisais, Denis
    Pageaux, Benjamin
    Ouellet, Capucine
    Jay, Ollie
    Maso, Fabien D.
    Begon, Mickael
    Saidi, Alireza
    Gendron, Philippe
    Gagnon, Daniel
    AMERICAN JOURNAL OF INDUSTRIAL MEDICINE, 2024, 67 (04) : 304 - 320
  • [9] Opportunistic Work-Rest Scheduling for Productive Aging
    Yu, Han
    Miao, Chunyan
    Cui, Lizhen
    Chen, Yiqiang
    Fauvel, Simon
    Yang, Qiang
    SOCIAL COMPUTING AND SOCIAL MEDIA: TECHNOLOGIES AND ANALYTICS, SCSM 2018, PT II, 2018, 10914 : 413 - 428
  • [10] A model used in creating a work-rest schedule for laborers
    Hsie, Machine
    Hsiao, Wen-ta
    Cheng, Tao-ming
    Chen, Hsieh-ching
    AUTOMATION IN CONSTRUCTION, 2009, 18 (06) : 762 - 769