Proposed Force Majeure Clause for Construction Contracts under Civil and Common Laws

被引:12
|
作者
Ezeldin, A. Samer [1 ]
Abu Helw, Amr [2 ,3 ]
机构
[1] Amer Univ Cairo, Construct Dept, Cairo 11835, Egypt
[2] Amer Univ Cairo, Construct Engn Dept, Cairo 11835, Egypt
[3] Engn Consultants Grp Firm, Contracts Dept, Alexandria Desert Rd, Cairo 10011, Egypt
关键词
D O I
10.1061/(ASCE)LA.1943-4170.0000255
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Force majeure is one of the most critical risks in the construction industry. It is a civil law concept, but not a term of art in common law. The majeure event may hinder a contract party from fulfilling its obligations for a reason beyond its control. Thus, it is vital to have a well-drafted force majeure clause to excuse to the affected party from further performance of its obligations. This paper aims to propose a force majeure clause applicable to contracts governed by either civil law or common law. To achieve that aim, a survey was conducted to explore the opinions of a selected group of professionals in the construction field. Hence, a model clause was developed based on the literature review, the survey results, and the contracts dealt with by the authors in their careers. The model clause was then verified by three experts in contracts administration and validated by comparing it with four megaproject contracts. The results of the comparison proved that the model clause is comprehensive and can be applied to construction contracts to achieve its intended purpose. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 9 条
  • [1] A Proposed Pandemic Clause for Force Majeure Events under Construction Contracts in Malaysia
    Zin, Shahrizal Mohd
    Rahmat, Nur Ezan
    Razak, Abdul Mu'iz Abdul
    Fathi, Nik Hasbi
    Budiartha, I. Nyoman Putu
    [J]. ENVIRONMENT-BEHAVIOUR PROCEEDINGS JOURNAL, 2021, 6 (16): : 33 - 37
  • [2] Force Majeure Clause in Long-Term Petroleum Contracts: Key Issues in Drafting
    Firoozmand, Mahmoud Reza
    [J]. JOURNAL OF ENERGY & NATURAL RESOURCES LAW, 2006, 24 (03) : 423 - 438
  • [3] THE RISE OF FORCE MAJEURE AMID THE CORONAVIRUS PANDEMIC: LEGITIMACY AND IMPLICATIONS FOR ENERGY LAWS AND CONTRACTS
    Nwedu, Cosmos Nike
    [J]. NATURAL RESOURCES JOURNAL, 2021, 61 (01) : 1 - 18
  • [4] A Comparative Study on the Application of the Force Majeure Clause in International Commercial Contracts between Korea and English in the Era of COVID-19
    Lee, Byung-Chan
    Han, Nak-Hyun
    [J]. JOURNAL OF KOREA TRADE, 2022, 26 (07): : 167 - 184
  • [5] Features of civil liability of police officers for damage caused under the influence of force majeure
    Lilia, Strelbytska
    Mykola, Strelbytskyi
    Viktor, Shemchuk
    Mykhailo, Rizak
    Khrystyna, Kulhavets
    [J]. CUESTIONES POLITICAS, 2020, 38 (66): : 371 - 382
  • [6] Minimizing Liability of the COVID-19 Pandemic on Construction Contracts-A Structural Equation Model for Risk Mitigation of Force Majeure Impacts
    Chadee, Aaron Anil
    Gallage, Sihara
    Martin, Hector Hugh
    Rathnayake, Upaka
    Ray, Indrajit
    Kumar, Bimlesh
    Sihag, Parveen
    [J]. BUILDINGS, 2023, 13 (01)
  • [7] STRENGTHENING PENNSYLVANIA'S PROMPT PAYMENT LAWS: UNDER PUBLIC AND PRIVATE CONSTRUCTION CONTRACTS
    Petrongolo, Amedeo
    [J]. RUTGERS UNIVERSITY LAW REVIEW, 2020, 72 (03): : 815 - 836
  • [8] REVALUATING AIRCRAFT LEASING CONTRACTS IN THE PANDEMIC ERA: NAVIGATING THE CHALLENGES OF INVOKING FORCE-MAJEURE BY APPLYING HARDSHIP UNDER INTERNATIONAL COMMERCIAL LAW
    Agarwal, Tanya
    [J]. NOVUM JUS, 2021, 15 : 79 - 101
  • [9] Imputation of performance: comparative view under Unidroit Principles of International Commercial Contracts, Draft Common Frame of Reference and Civil Codes of Moldova, Romania and the Russian Federation
    Palamarciuc, Vladimir
    [J]. UNIFORM LAW REVIEW, 2018, 23 (3-4) : 487 - 505