FLOW-SHOP SCHEDULING WITH BRANCH-AND-BOUND METHOD

被引:84
|
作者
MCMAHON, GB
BURTON, PG
机构
关键词
D O I
10.1287/opre.15.3.473
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:473 / &
相关论文
共 50 条
  • [1] A computationally efficient Branch-and-Bound algorithm for the permutation flow-shop scheduling problem
    Gmys, Jan
    Mezmaz, Mohand
    Melab, Nouredine
    Tuyttens, Daniel
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 284 (03) : 814 - 833
  • [2] A GPU-accelerated Branch-and-Bound Algorithm for the Flow-Shop Scheduling Problem
    Melab, N.
    Chakroun, I.
    Mezmaz, M.
    Tuyttens, D.
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON CLUSTER COMPUTING (CLUSTER), 2012, : 10 - 17
  • [3] Fuzzy branch-and-bound algorithm for flow shop scheduling
    İzzettİn Temİz
    Serpİl Erol
    [J]. Journal of Intelligent Manufacturing, 2004, 15 : 449 - 454
  • [4] Fuzzy branch-and-bound algorithm for flow shop scheduling
    Temiz, I
    Erol, S
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) : 449 - 454
  • [5] A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
    Wang, Shijin
    Liu, Ming
    Chu, Chengbin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1143 - 1167
  • [6] A Hardware Architecture for the Branch and Bound Flow-Shop Scheduling Algorithm
    Daouri, Mikhael
    Escobar, Fernando A.
    Chang, Xin
    Valderrama, Carlos
    [J]. 2015 NORDIC CIRCUITS AND SYSTEMS CONFERENCE (NORCAS) - NORCHIP & INTERNATIONAL SYMPOSIUM ON SYSTEM-ON-CHIP (SOC), 2015,
  • [7] A modified branch and bound algorithm for a vague flow-shop scheduling problem
    Gholizadeh, H.
    Fazlollahtabar, H.
    Gholizadeh, R.
    [J]. IRANIAN JOURNAL OF FUZZY SYSTEMS, 2019, 16 (04): : 55 - 64
  • [8] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
    Jen-Shiang Chen
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1186 - 1193
  • [9] APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS
    IGNALL, E
    SCHRAGE, L
    [J]. OPERATIONS RESEARCH, 1965, 13 (03) : 400 - &
  • [10] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
    Chen, Jen-Shiang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (11-12): : 1186 - 1193