共 50 条
- [2] A GPU-accelerated Branch-and-Bound Algorithm for the Flow-Shop Scheduling Problem [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON CLUSTER COMPUTING (CLUSTER), 2012, : 10 - 17
- [3] Fuzzy branch-and-bound algorithm for flow shop scheduling [J]. Journal of Intelligent Manufacturing, 2004, 15 : 449 - 454
- [6] A Hardware Architecture for the Branch and Bound Flow-Shop Scheduling Algorithm [J]. 2015 NORDIC CIRCUITS AND SYSTEMS CONFERENCE (NORCAS) - NORCHIP & INTERNATIONAL SYMPOSIUM ON SYSTEM-ON-CHIP (SOC), 2015,
- [7] A modified branch and bound algorithm for a vague flow-shop scheduling problem [J]. IRANIAN JOURNAL OF FUZZY SYSTEMS, 2019, 16 (04): : 55 - 64
- [8] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem [J]. The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1186 - 1193
- [10] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (11-12): : 1186 - 1193