HOW TO DETERMINE OFF-SITE MEETING COSTS

被引:0
|
作者
MCKEON, WJ
机构
来源
TRAINING AND DEVELOPMENT JOURNAL | 1981年 / 35卷 / 05期
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:116 / &
相关论文
共 50 条
  • [1] Off-site focus: Meeting the budget
    Cannon, Jacquie
    [J]. Concrete Engineering International, 2000, 4 (03):
  • [2] THE OFF-SITE COSTS OF SOIL-EROSION
    CLARK, EH
    [J]. JOURNAL OF SOIL AND WATER CONSERVATION, 1985, 40 (01): : 19 - 22
  • [3] ECONOMICS OF REDUCING OFF-SITE COSTS OF WIND EROSION
    HUSZAR, PC
    [J]. LAND ECONOMICS, 1989, 65 (04) : 333 - 340
  • [4] Off-site
    不详
    [J]. STUDI PIEMONTESI, 2022, 51 (01): : 305 - 305
  • [5] Viability of off-site inspections to determine bridge defect ratings
    Nepomuceno, D. T.
    Vardanega, P. J.
    Tryfonas, T.
    Bennetts, J.
    Denton, S. R.
    Collard-Jenkins, S.
    Thackray, C.
    Green, J.
    DiNiro, M.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 3688 - 3695
  • [6] How do you manage an off-site team?
    [J]. Harv Bus Rev, 4 (22):
  • [7] How do you manage an off-site team
    Maruca, RP
    [J]. HARVARD BUSINESS REVIEW, 1998, 76 (04) : 22 - +
  • [8] Off-site focus
    [J]. Concrete Engineering International, 3 (05):
  • [9] OFF-SITE ARCHAEOLOGY
    WILKINSON, TJ
    [J]. RESEARCH & EXPLORATION, 1992, 8 (02): : 196 - 207
  • [10] Off-site focus
    [J]. Concrete Engineering International, 3 (04):