SIMULATION-MODEL FOR COTTON HARVESTING MACHINERY

被引:0
|
作者
CHEN, LH
AHMAD, T
WILLCUTT, MH
机构
来源
TRANSACTIONS OF THE ASAE | 1992年 / 35卷 / 03期
关键词
COTTON HARVESTING; MACHINERY; MODELING;
D O I
暂无
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
A computer simulation model of cotton harvesting and handling system was developed. The system can consist of any number of harvesters, module builders, and boll buggies. The results from unvalidated simulation were as follows: a) initial harvest date significantly affects the lint picked and total revenue; b) one harvester is more economical than two harvesters for a 283.3-hectare farm; and c) the system without a boll buggy results in higher total return than the system with one boll buggy when harvester dumping times are short.
引用
收藏
页码:1071 / 1077
页数:7
相关论文
共 50 条