共 50 条
- [3] DESIGN AND CONSTRUCTION OF THE WEST FORD FLAT POWER-PLANT AT THE GEYSERS GEYSERS - THREE DECADES OF ACHIEVEMENT : A WINDOW ON THE FUTURE, 1989, 13 : 669 - 672
- [5] GEOTHERMAL POWER-PLANT DESIGN WITH OPERATION AND MAINTENANCE IN MIND NEW HORIZONS, 1988, 12 : 385 - 387
- [6] MEASUREMENT OF ENVIRONMENTAL RELEASES OF RADON FROM THE GEYSERS GEOTHERMAL POWER-PLANT TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 81 - 81
- [7] POWER-PLANT OPERATING ALTERNATIVES FOR IMPROVING AND EXTENDING RESERVOIR PERFORMANCE AT THE GEYSERS GEYSERS - THREE DECADES OF ACHIEVEMENT : A WINDOW ON THE FUTURE, 1989, 13 : 581 - 588
- [9] IMPORTANCE OF INDUSTRIAL MEASURING TECHNIQUES IN THE DESIGN AND OPERATION OF POWER-PLANT EQUIPMENT ENERGIETECHNIK, 1979, 29 (09): : 362 - 366
- [10] TECHNOLOGICAL ADVANCEMENTS IN COAL-FIRED POWER-PLANT DESIGN AND OPERATION TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 46 : 4 - 4