AN HEURISTIC METHOD FOR TARDINESS SCHEDULING PROBLEMS

被引:0
|
作者
KLEIN, CM
VENTURA, JA
机构
关键词
D O I
10.1016/0360-8352(89)90076-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:288 / 292
页数:5
相关论文
共 50 条
  • [1] AN HEURISTIC FOR TARDINESS SCHEDULING
    KLEIN, CM
    HEBERT, W
    [J]. 1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS, 1989, : 241 - 246
  • [2] A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems
    Arthur Kramer
    Anand Subramanian
    [J]. Journal of Scheduling, 2019, 22 : 21 - 57
  • [3] A Heuristic Method for Vehicle Scheduling Problems
    Guo Yaohuang
    Jun
    Tong Shuliul(School of Economics and Management
    [J]. Railway Engineering Science, 1995, (01) : 1 - 8
  • [4] AN EXTENSION OF THE TARDINESS HEURISTIC FEEDBACK ALGORITHM FOR SCHEDULING
    MULLIGAN, JH
    SOERHEIM, EA
    KIRAN, AS
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1991, 10 (02) : 158 - 165
  • [5] A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems
    Kramer, Arthur
    Subramanian, Anand
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (01) : 21 - 57
  • [6] A heuristic-based hybrid solution for parallel machine scheduling problems with earliness and tardiness penalties
    Tamaki, H
    Murao, H
    Kitamura, S
    [J]. ETFA 2003: IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2003, : 239 - 244
  • [7] A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimization
    Chakravarthy, K
    Rajendran, C
    [J]. PRODUCTION PLANNING & CONTROL, 1999, 10 (07) : 707 - 714
  • [8] A heuristic for emergency operations scheduling with lead times and tardiness penalties
    Lei, Lei
    Lee, Kangbok
    Dong, Hui
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 250 (03) : 726 - 736
  • [9] A heuristic for job shop scheduling to minimize total weighted tardiness
    Asano, M
    Ohta, H
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 137 - 147
  • [10] Earliness and tardiness scheduling problems on a batch processor
    Qi, XT
    Tu, FS
    [J]. DISCRETE APPLIED MATHEMATICS, 1999, 98 (1-2) : 131 - 145