AN APPROXIMATE CALCULATION OF OPTIMAL REPAIR-COST LIMITS UNDER MINIMAL REPAIR

被引:0
|
作者
CHUNG, KJ
机构
[1] Department of Industrial Management, National Taiwan Institute of Technology, Taipei
关键词
REPAIR COST LIMIT; MINIMAL REPAIR; REPLACEMENT;
D O I
10.1080/03052159408941348
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper examines optimal repair-cost limits for a Weibull-distributed time to failure and an exponentially distributed repair cost. Bounds are derived for the optimal repair cost limit that minimizes the average cost per unit time for repairs and replacement. With those bounds, a simple algorithm is developed to obtain the optimal repair-cost limit. Numerical examples are given to illustrate the algorithm.
引用
收藏
页码:119 / 123
页数:5
相关论文
共 50 条
  • [1] A Bivariate Optimal Replacement Policy for a System With Age-dependent Minimal Repair and Cumulative Repair-cost Limit
    Chang, Chin-Chih
    Sheu, Shey-Huei
    Chen, Yen-Luan
    [J]. COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2013, 42 (22) : 4108 - 4126
  • [2] Optimal preventive replacement under minimal repair and random repair cost
    Makis, V
    Jiang, X
    Cheng, K
    [J]. MATHEMATICS OF OPERATIONS RESEARCH, 2000, 25 (01) : 141 - 156
  • [3] Determination of optimal repair-cost limit on the Lorenz curve
    Dohi, T
    Kaio, N
    Osaki, S
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2001, 44 (03) : 207 - 219
  • [4] Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Chien, Yu-Hung
    [J]. ANNALS OF OPERATIONS RESEARCH, 2011, 186 (01) : 317 - 329
  • [5] Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
    Shey-Huei Sheu
    Chin-Chih Chang
    Yu-Hung Chien
    [J]. Annals of Operations Research, 2011, 186 : 317 - 329
  • [6] The Lorenz transform approach to the optimal repair-cost limit replacement policy with imperfect repair
    Dohi, T
    Othman, FS
    Kaio, N
    Osaki, S
    [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 2001, 35 (01): : 21 - 36
  • [7] Optimal number of minimal repairs before replacement based on a cumulative repair-cost limit policy
    Chang, Chin-Chih
    Sheu, Shey-Huei
    Chen, Yen-Luan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 603 - 610
  • [8] OPTIMAL REPAIR-COST LIMIT FOR A CONSUMER FOLLOWING EXPIRY OF A WARRANTY
    CHUNG, KJ
    [J]. MICROELECTRONICS AND RELIABILITY, 1994, 34 (10): : 1689 - 1692
  • [9] A graphical method to repair-cost limit replacement policies with imperfect repair
    Dohi, T
    Kaio, N
    Osaki, S
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) : 99 - 106
  • [10] DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR
    Iwamoto, Kazuki
    Dohi, Tadashi
    Kaio, Naoto
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (06) : 735 - 751