共 50 条
- [2] AUTOMATIC GENERATION CONTROL OF HYDRO-THERMAL SYSTEM. Journal of the Institution of Engineers (India): Electrical Engineering Division, 1980, 61 (pt EL 2): : 85 - 91
- [3] Automatic generation control of a hydro-thermal system in deregulated environment ICEMS 2005: PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS, VOLS 1-3, 2005, : 942 - 947
- [4] Multiresolution modeling of hydro-thermal systems PICA 2001: 22ND IEEE POWER ENGINEERING SOCIETY INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 2001, : 5 - 10
- [5] Hydro-thermal system transaction analysis CONTROL OF POWER SYSTEMS AND POWER PLANTS 1997 (CPSPP'97), 1998, : 551 - 556
- [6] AUTOMATIC GENERATION CONTROL OF HYDRO-THERMAL SYSTEM CONSIDERING GENERATION RATE CONSTRAINT. Journal of the Institution of Engineers (India): Electrical Engineering Division, 1983, 63 (pt EL 6): : 289 - 297
- [7] On some aspects of Automatic Generation Control of a two area Hydro-Thermal system Proceedings of the Eighth IASTED International Conference on Power and Energy Systems, 2005, : 84 - 89
- [8] HYDRO-THERMAL OPTIMIZATION OF PG AND E SYSTEM IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (06): : 2260 - &
- [9] Unit commitment optimization in hydro-thermal system '99 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1999, : 607 - 611