PIPELINE TESTING, REQUALIFICATION CHALLENGES CONTRACTOR SKILLS

被引:0
|
作者
SHEEHAN, D [1 ]
机构
[1] SHEEHAN PIPELINE CONSTRUCT CO,TULSA,OK
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
引用
收藏
页码:22 / &
相关论文
共 50 条
  • [1] PIPELINE PROTECTION - ROLE OF COATING CONTRACTOR
    NOWERS, MJ
    ANTI-CORROSION METHODS AND MATERIALS, 1975, 22 (11) : 17 - &
  • [2] Issues and challenges in the requalification of offshore platforms in Mexico
    Valdés, VH
    Ramirez, RO
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2000, 122 (02): : 65 - 71
  • [3] Challenges and changes in the contractor workforce
    McKeown, Tui
    Hanley, Glennis
    ASIA PACIFIC JOURNAL OF HUMAN RESOURCES, 2009, 47 (03) : 295 - 317
  • [4] PIPELINE CONTRACTOR THRIVES IN OWN BACK YARD
    不详
    HIGHWAY & HEAVY CONSTRUCTION, 1984, 127 (11): : 59 - 59
  • [5] CHALLENGES IN KIH TESTING USING WOL SAMPLES FOR PIPELINE APPLICATIONS
    Cravero, Sebastian
    Cristea, Mihaela E.
    Deul, Marije. L.
    Walters, Carey L.
    Valdez, Martin E.
    Darcis, Philippe
    PROCEEDINGS OF ASME 2023 PRESSURE VESSELS & PIPING CONFERENCE, PVP2023, VOL 5, 2023,
  • [6] In Vitro Vaccine Potency Testing: A Proposal for Reducing Animal Use for Requalification Testing
    Brown, K.
    Stokes, W.
    POTENCY TESTING OF VETERINARY VACCINES FOR ANIMALS: THE WAY FROM IN VIVO TO IN VITRO, 2012, 134 : 75 - +
  • [7] TESTING MAY BE BYPASSED IN CONTRACTOR SPECIFICATIONS
    HAGEMAIE.DJ
    METAL PROGRESS, 1971, 100 (04): : 7 - &
  • [8] General Contractor Superintendent Skills and Attributes for Career Success
    Rios, Daniel
    Rouhanizadeh, Behzad
    Kermanshachi, Sharareh
    Akhavian, Reza
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 485 - 494
  • [9] Challenges in requalification and rehabilitation of offshore platforms - On the experience and developments of a Norwegian operator
    Gudmestad, OT
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2000, 122 (01): : 3 - 6
  • [10] Contractor rises to challenges at cheese processing plant
    Journal of Protective Coatings and Linings, 2006, 23 (11): : 105 - 107