An Automatic Haulage Truck (AHT) has been developed for manless tramming of run-of-mine material in an operating mine The AHT has a 70-ton capacity and uses an electric trolley system in combination with a computer control system to operate the vehicle The purpose of the AHT was to provide a high capacity, high productivity material transfer system where conveyor belt applications are not immediately practical. The AHT project was started in 1983 at Inco Limited, Ontario Division as a result of the need for rapid material transport to match increased extraction rates resulting from bulk mining methods. The original concept was to use a continuous loader with the truck. However, in order to minimize development problems the truck project was considered a stand-alone project The AHT project consisted of concept development preliminary and detailed design, manufacture, surface testing and mine implementation. The AHT was manufactured and ready for testing in 1988. At this point the truck was first moved onto the test track for debugging. This proved successful and in 1989 the decision was made to install the AHT at Little Stobie mine on 2000 level Commissioning of the system was started in 1990 and at present a fully functional automated haulage system is in place at Little Stobie mine producing 3000 tons/day. This paper describes the project presenting results achieved to date.
引用
收藏
页码:41 / 46
页数:6
相关论文
共 9 条
  • [1] MINE-WIDE INFORMATION-SYSTEM DEVELOPMENT AT INCO-LIMITED
    BAIDEN, GR
    SCOBLE, M
    CIM BULLETIN, 1992, 85 (960): : 65 - 70
  • [2] Design and Implementation of Automatic Drainage in Coal Mine
    Liu, Zhihai
    Zeng, Qingliang
    Wu, Zaichao
    Zhou, Guangyu
    MATERIALS PROCESSING TECHNOLOGY, PTS 1-4, 2011, 291-294 : 2851 - +
  • [3] AUTOMATIC FIRE PROTECTION SYSTEMS FOR LARGE HAULAGE VEHICLES - PROTOTYPE DEVELOPMENT AND IN-MINE TESTING.
    Johnson, Guy A.
    Forshey, David R.
    1600,
  • [4] FADIS: An integrated development environment for automatic design and implementation of FLC
    Kim, D
    Cho, IH
    1997 ANNUAL MEETING OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY - NAFIPS, 1997, : 33 - 39
  • [5] Design and development of automatic creation software for surface mine's boundary drawings
    Chen, Jianhong
    Huagong Kuangshan Jishu/Technology for Chemical Mines, 27 (03): : 5 - 7
  • [6] Design and implementation of automatic continuous transportation system for shor-wall mining in coal mine
    Hao J.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2021, 49 (06): : 213 - 218
  • [7] Characterization and Development of Truck Axle Load Spectra for Implementation of New Pavement Design Practices in Louisiana
    Ishak, Sherif
    Shin, Hak-Chul
    Sridhar, Bharath Kumar
    Zhang, Zhongjie
    TRANSPORTATION RESEARCH RECORD, 2010, (2153) : 121 - 129
  • [8] Development and Implementation of the Gear Design Parameters Automatic Generation System Based on VB
    Long, Shuping
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING MATERIALS AND TECHNOLOGY, 2015, 38 : 259 - 265
  • [9] THE DESIGN, DEVELOPMENT AND IMPLEMENTATION OF AN IMAGING-SYSTEM FOR THE AUTOMATIC ALARM INTERPRETATION OF CCTV SEQUENCES USING IKBS TECHNIQUES
    CUSTANCE, NDE
    GOLTON, P
    ELLIS, TJ
    ROSIN, P
    MOUKAS, P
    1989 INTERNATIONAL CARNAHAN CONFERENCE ON SECURITY TECHNOLOGY, 1989, : 223 - 228