共 31 条
- [1] Availability performance of fossil-fired and nuclear power plants around the world [J]. TOPNUX '96: ECONOMIC NUCLEAR POWER FOR THE 21ST CENTURY, VOLS 1 AND 2: ECONOMIC NUCLEAR POWER FOR THE 21ST CENTURY: TOWARDS THE NEW GENERATION OF REACTORS, 1996, : 521 - 531
- [2] EFFICIENCY IMPROVEMENT IN FOSSIL-FIRED POWER-PLANTS [J]. MECHANICAL ENGINEERING, 1983, 105 (12): : 89 - 89
- [4] Efficiency-improving modernization of fossil-fired power plants [J]. BRENNSTOFF-WARME-KRAFT, 1997, 49 (05): : 36 - +
- [5] On-line economic control in fossil-fired power plants [J]. Simon, M., 2000, VGB-Kraftwerkstechnik GmbH, Essen, Germany (80):
- [6] SOLAR-AUGMENT POTENTIAL OF US FOSSIL-FIRED POWER PLANTS [J]. PROCEEDINGS OF THE ASME 5TH INTERNATIONAL CONFERENCE ON ENERGY SUSTAINABILITY 2011, PTS A-C, 2012, : 641 - 651
- [7] A SURVEY OF RECENT WORLDWIDE EXPERIENCE IN NUCLEAR AND FOSSIL-FIRED PLANTS GENERATION ECONOMICS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 43 : 134 - 135
- [8] Efficiency increase in fossil-fired steam power plants by converting them into combined plants [J]. BRENNSTOFF-WARME-KRAFT, 1996, 48 (10): : 44 - &
- [10] Development of creep life assessment technique for boiler parts of fossil-fired power plants [J]. SIXTH INTERNATIONAL CONFERENCE ON CREEP AND FATIGUE: DESIGN AND LIFE ASSESSMENT AT HIGH TEMPERATURE, 1996, 1996 (02): : 463 - 472